Dercos Dved materials used Heating and costs for actory non acary equipment The company times 1.500 d borhon be A. 567 O $39 OC 5122 OD 541 In the basic flow of inventory through a manufacturing system, which of the following occurs last in the job costing system? O A. Finished goods inventory OB. Work in process inventory OC. Cost of goods sold O D. Raw materials inventory Showbout Corporation had actual mancung overhead costs for the most recent 500 g va c a ng d e r OA 6.500 O 7.129 OC. 6.000 OD 6.905 Companies use job costing when their products or services van eeded, time required to complete the product and/or the complety of the production process 612 resolo Smarty Parts Corporation manufactures high end custom baches of designer pantsuits. The company allocate manufacturing overhead based on machine hours Selected data for costs incurred for Dred materials used Direct labor hours worked Machine hours used Dred labor rate per hour Predetermined overhead rate based on machine hours What amount of manufacturing overhead would be allocated to Job 612 OA $5.300 OB 38.100 OC $8.820 OD $10.350 Custom Engines Company has the following estimated costs for the upcoming year Dred labor costs Dred malers used Salary of factory supervisor Sales commissions Heating and ging costs for factory Depreciation on factory equipment Advertising expense The company estimates a 1.600 dret bor hours will be worked in the coming year we 2.300 machine hours will be used during the year. The pretermined mandharing overhead me perdedor hours at whole Pound your nam e O A 967 OB 539 OC. $122 OD. 141 In the basic flow of inventory through a manufacturing system, which of the following occurs last in the job costing system? O A. Finished goods inventory OB. Work in process inventory O c. Cost of goods sold OD. Raw materials inventory Showboat Corporation had actual manufacturing overhead costs for the most recent year of $20.000 Mantang overhead stocated using a predetermi n adungowende the end of the year, Cabaret Corporation found it had overallocated manufacturing overhead by 1.550. How many dre bor hours were worked in anng the year round your br o perdredh u Dendro ther out) per OA 5,500 ON 7.220 OC 6,000 OD 6.955 Companies use job costing when their products or services vary in terms of materials needed, time required to complete the product, and/or the complexity of the production process. O O True False Custom Engines Company has the own e d costs for the upcoming year Heating and ging costs for factory The company recor hours bewond in the upcoming www. chons wil bewed The pred manufacturing our s ound your truerto OC. 1122 DHE In the basic flow of inventory through a manufacturing system, which of the following occurs last in the job costing system? O A. Finished goods inventory O B. Work in process inventory OC. Cost of goods sold OD. Raw materials inventory Showboat Corporation had actual manufacturing overhead costs for the most recent year of 20600. Manufacturing overhead is located using a predetermined manufacturing overhead the end of the year. Cabaret Corporation found had over mancang overhead by Howany d o ors were wo u ng the year and your a of 1425 per direct laborhout Direct labor cost is 519 per hout rt the earth) OA 6.5 OB 720 OC 6600 OD 6.965 Companies use job costing when their products or services vary in terms of materials needed, time required to complete the product, and/or the complexity of the production process. O True o Falso Smarty Pants Corporation manufactures high end custom batches of designer pant suts. The company locates manufacturing overhead based on machine hours Selected data for costs incurred for 30 612 was low De manused Dreator hours worked Machine hours used Dred a te per hour Predetermined overhead based on machine hours What amount of manufacturing overhead would be allocated to Job 612? OA 16300 OR$100 OC 18.020 OD 10.50