Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Description Hosting a Halloween party is a fun project. As a project manager, you are going to develop the Work Breakdown Structure (WBS) and the

image text in transcribed
image text in transcribed
Description Hosting a Halloween party is a fun project. As a project manager, you are going to develop the Work Breakdown Structure (WBS) and the WBS dictionary. The WBS should include: - At least 3 deliverables - At least 6 sub-deliverables - At least 20 work-packages - The numbering system that enables readers to track the hierarchical structure of deliverables, sub-deliverables, and the work-packages. - The cost and labor hour estimations for each item. The WBS Dictionary should be developed for each workpackage in the WBS - Students can refer to Figure 6.3 in our textbook page 100 as the template of the WBS dictionary. - Students are expected to provide as much detailed information in the WBS dictionary. Figure 6.3 A WBS Dictionary Template Project: Warehouse Last Modifiod: October 19t; 2016 Work Package Name: Prefab Joist Work Package 10:3.1.1 Description of Work: The joists and struts for the warehouse root will be prefabricated offsite and then brought to the job site for installation. Wood 26 s will be used for creation of the joists. Milestones 1. Delivery of all raw materials 2. Complete pre-fabrication of joists 3. Delivery to work site. Accoptance Criteria: Visual Inspection at Job Site Tochnical information: Contact information: Jim Crows, 555-1251 MacBook Pro Description Hosting a Halloween party is a fun project. As a project manager, you are going to develop the Work Breakdown Structure (WBS) and the WBS dictionary. The WBS should include: - At least 3 deliverables - At least 6 sub-deliverables - At least 20 work-packages - The numbering system that enables readers to track the hierarchical structure of deliverables, sub-deliverables, and the work-packages. - The cost and labor hour estimations for each item. The WBS Dictionary should be developed for each workpackage in the WBS - Students can refer to Figure 6.3 in our textbook page 100 as the template of the WBS dictionary. - Students are expected to provide as much detailed information in the WBS dictionary. Figure 6.3 A WBS Dictionary Template Project: Warehouse Last Modifiod: October 19t; 2016 Work Package Name: Prefab Joist Work Package 10:3.1.1 Description of Work: The joists and struts for the warehouse root will be prefabricated offsite and then brought to the job site for installation. Wood 26 s will be used for creation of the joists. Milestones 1. Delivery of all raw materials 2. Complete pre-fabrication of joists 3. Delivery to work site. Accoptance Criteria: Visual Inspection at Job Site Tochnical information: Contact information: Jim Crows, 555-1251 MacBook Pro

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions

Question

List the base units in the Metric System and English Units.

Answered: 1 week ago