Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Design control program for a vending machine using PLC , including wiring diagram,SFC , initial condition, transition, state, output, timer, counter if needed.Technical Requirements: 1
Design control program for a vending machine using PLC including wiring diagram,SFC initial condition, transition, state, output, timer, counter if needed.Technical Requirements: There are three kinds of beverage in the vending machine and only coins can be inserted into the machine, ie$$$ When more than $ are inserted, the light of seven up is on When more than$ are inserted, the lights of seven up and cola are on When more than $ are inserted, the lights of seven up cola and mineral water Evian are on When any button of beverage is pressed, it takes s to eject one tin of beverage To give change, one button has to be pressed. When the change is more thanS the light of seven up is still on Similarly, when the change is more thanS AKe lights of seven up and cola are on When press the button for giving change, all the lights are off.Report should include this items Instruction of your design Wiring diagram with instructions SFC with instructions Programs, each part should be explained in words ConclusionsReport should be written within pages.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started