Design of particular conditions for specific case Here is a work designed for a building The Employer try to provide some plastic pipes which will

Design of particular conditions for specific case

Here is a work designed for a building

The Employer try to provide some plastic pipes which will be used in closet.
tips
1 Price and tax
2 Care and consume control
3 Defects liability and third party repair?
4 Inspection
5 Pipe connection
The Employer prefer to use US dollar except local currency.
The Contractors mail address is No. 8 Longao North Road, Lixia District, Jinan, Shandong Province, China, 250098, Telephone: 0086-531-89251399,Fax: 0086-531-89251377.
The Contractor ask the Employer to give assistance to apply for the workers permission and clearance of goods related to the work.
The Employer need the Contractors to provide the Performance Security which shall be a Bank Guarantee issued in United Stated Dollars, annexed as to Appendix.
The Contractors Representative is not fluent in English.
The Contractors ask the Employer to a give a convenience in using in-land transportation in the country.
The following Specification should be used for the work.
Technical Specification for Construction of Highway Subgrades of the Peoples Republic of China (JTG F10-2006),
Technical Specification for Construction and Taking-over of Asphalt Pavement of the Peoples Republic of China (GB5009296),
Technical Specification for Construction of Asphalt Pavement of the Peoples Republic of China (JTG F402004),
Technical Specification for Construction of Pavement Base Course of the Peoples Republic of China (JTJ0342000),
Technical Specification for Construction of Quality-changed Asphalt Pavement of the Peoples Republic of China (JTJ03698),
Technical Specification for Construction Safety of Highway of the Peoples Republic of China (JTJ07695),
Technical Specification for Construction of Highway Safety Facility of the Peoples Republic of China (JTG F71-2006),
Technical Specification for Application of Highway Compaction of the Peoples Republic of China ([2005]329),
In-situ Test Regulations for Subgrade and Pavement of the Peoples Republic of China (JTG E602008).
The Contractor need to import any personnel who are necessary for the execution of the Work. In the event of the death in the Country of any of these personnel or members of their families, the Contractor shall similarly be responsible for making the appropriate arrangements for their return or burial.The Employer shall be responsible for obtaining the required residence visas and work permits for the Contractors personnel. The contractor can make a claim if the Employer do not do so.
Delay damages is 0.01% of the Contract Price in the foreign currency. The bonus is 3000 US dollars a day with a maximum amount shall not beyond five percent of the price for the Work.
Interim payment shall be paid to the Contractor within 21 days after submission of the interim payment statement to Employer by the Contractor.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Financial Accounting

Authors: Michael J. Jones

2nd Edition

1119977150, 978-1119977155

More Books

Students also viewed these Accounting questions

Question

Identify the job expectancy rights of employees.

Answered: 1 week ago