Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Details: 4.5.2 Project Plan: Project Charter and Scope: Develop a project charter according and a project scope according to CH 4 of Project Management and

Details:

4.5.2 Project Plan: Project Charter and Scope: Develop a project charter according and a project scope according to CH 4 of Project Management and given lecture presentations. The background information for the simulation will be used as the basis for both your charter and scope.

Use the project scope checklist as paragraph headings for that section; do not include "6. Reviews with customers". Include as part of the project scope a stakeholder analysis and a communications plan. The work breakdown structure (WBS) will be created in the CPM Pro Spreadsheet (MS Excel) and transferred to a table in the assignment.

For all planning, use the simulation Help Documentation, the Orientation Guide, and the Project (Alliance Prototype) Reference Guide. The MS Excel file will be turned in with the MS Word document. Format the paper (in MS Word) according to APA in terms of citations and references and use the project management "Code of Accounts" numbering system for the paragraphs (SLOs 2.2.1 - 2.2.8, 2.2.11 - 2.2.14).

Notes:

  1. You are required to cite any paraphrases, facts/stats, or support for your opinions/assertions, providing appropriate references on the references page (No quotations).
  2. You are required to use the Project Plan Template found in the Project Tools in the Canvas Classroom. You will begin using the template (do not change any of the paragraph headings as these show you what you are required to submit) with each project plan assignment. You will continuously submit and update the same template until you have completed your project plan at the end of the term. After a section has been graded, you will update/correct that section based on the instructor's grading comments, then you will work the next section, per the course schedule.
  3. Ensure you follow the grading rubrics found in the course assignments.

Charter and Scope
Criteria Ratings Pts

A well characterized project charter and scope is developed which include all relevant items listed in the PMBOK and the course textbook.

view longer description

33 pts

The charter and scope are aligned with the PMBOK and course text. The scope checklist was used to develop paragraph headings, and the WBS, stakeholder analysis, and communications plan was included. The WBS was creating using MS Project.

23.1 pts

At least 75% of the requirements were included in the assignment.

3.3 pts

Less then 75% of the requirements were included in the assignment.

/ 33 pts

The charter and scope are supported in literature (has at least one citation and reference).

view longer description

8.5 pts

The charter and scope assignment has at least one citation and reference

5.95 pts

The charter and scope assignment is missing either one citation or reference.

0.85 pts

The charter and scope assignment has no citation or reference.

/ 8.5 pts

Assignment and references formatting

view longer description

8.5 pts

The assignment and references are correctly formatted according to APA and PMBOK.

5.95 pts

There are 1 - 3 formatting errors.

0.85 pts

There are more than three errors.

/ 8.5 pts
Total Points: 0

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Introduction To Management In The Hospitality Industry

Authors: Clayton W Barrows, Tom Powers

7th Edition

9780471782766

More Books

Students also viewed these General Management questions

Question

Did the researcher do a dependability audit?

Answered: 1 week ago