Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis Mackinaw Inc. processes a base

Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis

image text in transcribedimage text in transcribed

Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 70,000 units of product were as follows: Standard Costs Actual Costs Direct materials 173,300 lbs. at $5.60 175,000 lbs. at $5.80 17,500 hrs. at $17.20 17,900 hrs. at $17.40 Direct labor Factory overhead Rates per direct labor hr., based on 100% of normal capacity of 18,260 direct labor hrs.: Variable cost, $4.00 Fixed cost, $6.30 $69,300 variable cost $115,038 fixed cost Each unit requires 0.25 hour of direct labor. Required: a. Determine the direct materials price variance, direct materials quantity variance, and total direct materials cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. Direct Materials Price Variance Direct Materials Quantity Variance Total Direct Materials Cost Variance b. Determine the direct labor rate varlance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number Direct Labor Rate Variance Direct Labor Time Variance Total Direct Labor Cost Variance c. Determine the variable factory overhead controllable variance, fixed factory overhead volume variance, and total factory overhead cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. Variable factory overhead controllable variance Fixed factory overhead volume variance $ Total factory overhead cost variance

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Eco Management The Elmwood Guide To Ecological Auditing And Sustainable Business

Authors: Ernest Callenbach, Fritjof Capra, Lenore Goldman, Rudiger Lutz

1st Edition

1881052273, 978-1881052272

More Books

Students also viewed these Accounting questions