Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct

Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis

Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 74,000 units of product were as follows:

Standard Costs Actual Costs
Direct materials 199,800 lbs. at $4.70 197,800 lbs. at $4.50
Direct labor 18,500 hrs. at $18.40 18,930 hrs. at $18.70
Factory overhead Rates per direct labor hr.,
based on 100% of normal
capacity of 19,310 direct
labor hrs.:
Variable cost, $4.20 $76,920 variable cost
Fixed cost, $6.60 $127,446 fixed cost

Each unit requires 0.25 hour of direct labor.

Required:

a. Determine the direct materials price variance, direct materials quantity variance, and total direct materials cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.

Direct Materials Price Variance $fill in the blank 1
Direct Materials Quantity Variance $fill in the blank 3
Total Direct Materials Cost Variance $fill in the blank 5

b. Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.

Direct Labor Rate Variance $fill in the blank 7
Direct Labor Time Variance $fill in the blank 9
Total Direct Labor Cost Variance $fill in the blank 11

c. Determine the variable factory overhead controllable variance, fixed factory overhead volume variance, and total factory overhead cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.

Variable factory overhead controllable variance $fill in the blank 13
Fixed factory overhead volume variance $fill in the blank 15
Total factory overhead cost variance $fill in the blank 17

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Audit Management A Complete Guide

Authors: Gerardus Blokdyk

2019 Edition

0655813640, 978-0655813644

More Books

Students also viewed these Accounting questions