Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for

image text in transcribed

Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 78,000 units of product were as follows: Standard Costs Direct materials Actual Costs 249,600 lbs. at $4.80 247,100 lbs. at $4.70 Direct labor Factory overhead 19,500 hrs. at $17.50 19,950 hrs. at $17.70 Rates per direct labor hr., based on 100% of normal capacity of 20,350 direct labor hrs.: Variable cost, $4.80 Fixed cost, $7.60 $92,660 variable cost $154,560 fixed cost Each unit requires 0.25 hour of direct labor. Required: a. Determine the direct materials price variance, direct materials quantity variance, and total direct materials cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. Direct Material Price Variance Direct Materials Quantity Variance Total Direct Materials Cast Variance Favorable Favorable Favorable b. Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. Direct Labor Rate Variance Direct Labor Time Variance $ Unfavorable Unfavorable Unfavorable Total Direct Labor Cost Varlance c. Determine variable factory overhead controllable variance, the fixed factory overhead volume variance, and total factory overhead cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. Variable factory overhead controllable variance Favorable Fixed factory overhead volume variance Total factory overhead cost variance Unfavorable Unfavorable

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Government and Not for Profit Accounting Concepts and Practices

Authors: Michael Granof, Saleha Khumawala, Thad Calabrese, Daniel Smith

7th edition

978-1118983270

Students also viewed these Accounting questions