Question
Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct
-
Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis
Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 70,000 units of product were as follows:
Standard Costs Actual Costs Direct materials 238,000 lbs. at $5.20 235,600 lbs. at $5.00 Direct labor 17,500 hrs. at $18.10 17,900 hrs. at $18.50 Factory overhead Rates per direct labor hr., based on 100% of normal capacity of 18,260 direct labor hrs.: Variable cost, $2.90 $50,240 variable cost Fixed cost, $4.60 $83,996 fixed cost Each unit requires 0.25 hour of direct labor.
Required:
a. Determine the direct materials price variance, direct materials quantity variance, and total direct materials cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
Direct Materials Price Variance $fill in the blank 1 Direct Materials Quantity Variance $fill in the blank 3 Total Direct Materials Cost Variance $fill in the blank 5 b. Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
Direct Labor Rate Variance $fill in the blank 7 Direct Labor Time Variance $fill in the blank 9 Total Direct Labor Cost Variance $fill in the blank 11 c. Determine the variable factory overhead controllable variance, fixed factory overhead volume variance, and total factory overhead cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
Variable factory overhead controllable variance $fill in the blank 13 Fixed factory overhead volume variance $fill in the blank 15 Total factory overhead cost variance $fill in the blank 17
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started