Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct

Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis

Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 5,600 units of product were as follows:

Standard Costs Actual Costs
Direct materials 7,300 lb. at $4.80 7,200 lb. at $4.70
Direct labor 1,400 hrs. at $18.20 1,430 hrs. at $18.50
Factory overhead Rates per direct labor hr.,
based on 100% of normal
capacity of 1,460 direct
labor hrs.:
Variable cost, $4.00 $5,540 variable cost
Fixed cost, $6.30 $9,198 fixed cost

Each unit requires 0.25 hour of direct labor.

Required:

a. Determine the direct materials price variance, direct materials quantity variance, and total direct materials cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.

Direct materials price variance $fill in the blank 1
Direct materials quantity variance fill in the blank 3
Total direct materials cost variance $fill in the blank 5

b. Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.

Direct labor rate variance $fill in the blank 7
Direct labor time variance fill in the blank 9
Total direct labor cost variance $fill in the blank 11

c. Determine variable factory overhead controllable variance, the fixed factory overhead volume variance, and total factory overhead cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.

Variable factory overhead controllable variance $fill in the blank 13
Fixed factory overhead volume variance fill in the blank 15
Total factory overhead cost variance $fill in the blank 17

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

The Practitioners Blueprint To Construction Auditing

Authors: Ron Risner

1st Edition

0894137263, 978-0894137266

More Books

Students also viewed these Accounting questions

Question

25.0 m C B A 52.0 m 65.0 m

Answered: 1 week ago