Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct
Direct Materials, Direct Labor, and Factory Overhead Cost Variance Analysis
Mackinaw Inc. processes a base chemical into plastic. Standard costs and actual costs for direct materials, direct labor, and factory overhead incurred for the manufacture of 74,000 units of product were as follows:
Standard Costs | Actual Costs | ||
Direct materials | 192,400 lbs. at $5.40 | 190,500 lbs. at $5.20 | |
Direct labor | 18,500 hrs. at $18.50 | 18,930 hrs. at $18.80 | |
Factory overhead | Rates per direct labor hr., | ||
based on 100% of normal | |||
capacity of 19,310 direct | |||
labor hrs.: | |||
Variable cost, $3.20 | $58,610 variable cost | ||
Fixed cost, $5.10 | $98,481 fixed cost |
Each unit requires 0.25 hour of direct labor.
Required:
a. Determine the direct materials price variance, direct materials quantity variance, and total direct materials cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
Direct Material Price Variance | $ | Favorable |
Direct Materials Quantity Variance | $ | Favorable |
Total Direct Materials Cost Variance | $ | Favorable |
b. Determine the direct labor rate variance, direct labor time variance, and total direct labor cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
Direct Labor Rate Variance | $ | Unfavorable |
Direct Labor Time Variance | $ | Unfavorable |
Total Direct Labor Cost Variance | $ | Unfavorable |
c. Determine variable factory overhead controllable variance, the fixed factory overhead volume variance, and total factory overhead cost variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number.
Variable factory overhead controllable variance | $ | Favorable |
Fixed factory overhead volume variance | $ | Unfavorable |
Total factory overhead cost variance | $ | Unfavorable |
_______________________________________________________________________________________________
Factory Overhead Cost Variances
Blumen Textiles Corporation began April with a budget for 47,000 hours of production in the Weaving Department. The department has a full capacity of 63,000 hours under normal business conditions. The budgeted overhead at the planned volumes at the beginning of April was as follows:
Variable overhead | $169,200 |
Fixed overhead | 119,700 |
Total | $288,900 |
The actual factory overhead was $292,400 for April. The actual fixed factory overhead was as budgeted. During April, the Weaving Department had standard hours at actual production volume of 49,000 hours. Determine the variable factory overhead controllable variance and the fixed factory overhead volume variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. Round your interim computations to the nearest cent, if required.
a. Variable factory overhead controllable variance: $ Favorable
b. Fixed factory overhead volume variance: $ Unfavorable
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started