Do you accept this project with the estimated required rate of return being 8.5%? You will use IRR as the measure. Time o 1 2
Do you accept this project with the estimated required rate of return being 8.5%? You will use IRR as the measure. Time o 1 2 3 4 Total CFs -1,250 325 485 435 425 Yes, accept No, reject