Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

DRAW OR IN POWERPOINT FORMAT Construct CPM Diagram (Activity on Node) Conduct forward pass Conduct backward pass Define critical path Accurately and completely label each

DRAW OR IN POWERPOINT FORMAT

Construct CPM Diagram (Activity on Node)

Conduct forward pass

Conduct backward pass

Define critical path

Accurately and completely label each node

Precedence

1.No other tasks can start until preliminary design is completed.

2.When preliminary design (A) is completed, final design (B), preparation of assembly and test requirements (C), and parts procurement (D) can start.

3.Assembly (E) cannot start until parts are procured (D), final design (B) is complete, and assembly and test requirements (C) are completed.

4.Procurement of test equipment (F) and preparation of test procedures (G) cannot start until requirements for assembly and test (C) are available.

5.Preparation of test fixtures (H) cannot start until test procedures (G) are available.

6.Testing (I) cannot start until assembly (E) is complete, test equipment (F) has been procured, and test fixtures (H) are available.

Tasks

Project Task & Duration

-Preliminary Design (A) - 5

-Final Design (B)- 7

-Prepare assembly and test requirements (C) -5

-Procure Parts (D) - 10

-Assembly (E) -8

-Procure test equipment (F) -12

-Prepare test procedures (G)- 7

-Prepare test fixtures (H) - 3

-Test (I) -3

supplemental questions

What becomes the critical path if 'Procure Test Equipment' (Task 'F') duration is increased to 20 weeks?

Based on the modified CPM network from the first question (Task F is 20 weeks), what becomes the critical path if 'Prepare assembly and test requirements' (Task 'C') duration is increased to 8 weeks?

What activities would you consider to be risky and why?

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Strategic Management

Authors: Richard L. Lynch

6th Edition

978-0273750925

More Books

Students also viewed these General Management questions