During project evaluation, projected cash flows can change signs from positive to negative and back again. If the signs change more than once, it is
During project evaluation, projected cash flows can change signs from positive to negative and back again. If the signs change more than once, it is best to
a accept the project.
b not bother calculating the NPV
c not bother calculating the IRR.
d reject the project