Question
During the week of May 10, Hyrum Manufacturing produced and shipped 16,000 units of its aluminum wheels: 4,000 units of Model A and 12,000 units
-
During the week of May 10, Hyrum Manufacturing produced and shipped 16,000 units of its aluminum wheels: 4,000 units of Model A and 12,000 units of Model B. The cycle time for Model A is 1.09 hours and for Model B is 0.47 hour. The following costs and production hours were incurred:
Hyrum Manufacturing Value-Stream Costs and Production Hours This Week, May 10 Net Hours Materials Salaries /Wages Machining Other Total Cost Order processing 1,600 $18,000 $18,000 Production planning 100 36,000 36,000 Purchasing 800 27,000 27,000 Stamping 2,000 $267,000 145,500 $36,000 $18,000 466,500 Welding 2,400 100,000 42,000 42,000 12,000 196,000 Cladding 500 75,000 50,000 125,000 Inspection 600 10,500 10,500 Packaging and shipping 600 9,000 9,000 Invoicing 1,400 12,000 12,000 Totals 10,000 $442,000 $350,000 $78,000 $30,000 $900,000 Required:
1. Assume that the value-stream costs and total units shipped apply only to one model (a single-product value stream). Calculate the unit cost. $ per unit
Complete the statement below on the accuracy of the value computed.
The cost is
- very
- somewhat
- not very
2. Assume that Model A is responsible for 40% of the materials cost. Calculate the unit cost for Models A and B. Explain the rationale for using units shipped instead of units produced in the calculation. Round your answers to two decimal places.
Model A $ Model B $ Complete the statement below on the accuracy of the Model A and Model B values computed.
When products are heterogeneous or reflect a great deal of variety through custom designing, then using average conversion cost
- is
- is not
Complete the statement below that explains the rationale for using units shipped instead of units produced in the calculation. Using units shipped for the unit calculation motivates managers to
- reduce inventories
- reduce production time
- increase quality
3. Calculate the unit cost for the two models, using DBC. Explain when and why this cost is more accurate than the unit cost calculated in Requirement 2. Round your answers to two decimal places.
Model A $ Model B $ Explain when and why this cost is more accurate than the unit cost calculated in Requirement 2. DBC approximates ABC cost assignments and
- mirrors
- so better reflects
- does not reflect
Feedback
Loading item
There was an error loading this item. If this continues to occur, please contact Technical Support.
Check My Work2 more Check My Work uses remaining.
- Previous
- Next
- 100% Correct
- Partially Correct
- Incorrect
- Needs Instructor Grading
Basic Calculatorclose
0
UseEntBSBSpCEHomCEnd
789+
456-
123*
0.=/
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started