Electrocomp's management realizes that it forgot to include two critical constraints (see Problem 7-14). In particular, management decides that there should be a minimum number

Electrocomp's management realizes that it forgot to

include two critical constraints (see Problem 7-14). In

particular, management decides that there should be a

minimum number of air conditioners produced in

order to fulfill a contract. Also, due to an oversupply of fans in the preceding period, a limit should be

placed on the total number of fans produced.

(a) If Electrocomp decides that at least 20 air conditioners

should be produced but no more than 80

fans should be produced, what would be the optimal

solution? How much slack is there for each

of the four constraints?

(b) If Electrocomp decides that at least 30 air conditioners

should be produced but no more than

50 fans should be produced, what would be

the optimal solution? How much slack is there

for each of the four constraints at the optimal

solution?

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Holt Algebra 1 Ohio

Authors: Edward B. Burger, Holt, Rinehart And Winston

Student Edition

0030932947, 978-0030932946

More Books

Students also viewed these Mathematics questions