Element code Units/factor price unit 1-2-3 ??? 107000000 find unit factor plaese - A coal-fired generating plant twice the size of the one you are
Element code Units/factor price unit
1-2-3 ??? 107000000
find unit factor plaese
- A coal-fired generating plant twice the size of the one you are estimating was built in 1996. The 1996 boiler (1.2) and boiler support system (1.3) cost $107 million. The cost index for boilers was 107 in 1996 , it is 500 in 2019 . The cost capacity factor for similar boilers and support systems is 0.95. The 600 -acre site is on property you already own, but improvements (1.1.1) and roads (1.1.2) will cost $1,900 per acre, and railroads (1.1.3) will cost $3,000,000. Project integration (1.9) is projected to cost 5% of all other construction costs. - The security systems (1.5.4) are expected to cost $1,300 per acre, according to recent (2019) construction of similar plants. All other support facilities and equipment (1.5) elements are to be built by Viscount Engineering. Viscount Engineering has built the support facilities and equipment elements for two similar generating plants. Their experience is expected to reduce labor requirements substantially; a 95% learning curve can be assumed. Viscount built the support facilities and equipment on their first job in 90,000 hours. For this project, Viscount's labor will be billed to you at $60 per hour. Viscount estimates that materials for the construction of the support facilities and equipment elements (except 1.5.4) will cost you $17,000,000 - The coal storage facility (1.4) for the coal-fired generating plant built in 1996 cost $4.8 million. Although your plant is smaller, you require the same size coal storage facility as the 1996 plant. You assume you can apply the cost index for similar boilers to the coal storage facility. - A coal-fired generating plant twice the size of the one you are estimating was built in 1996. The 1996 boiler (1.2) and boiler support system (1.3) cost $107 million. The cost index for boilers was 107 in 1996 , it is 500 in 2019 . The cost capacity factor for similar boilers and support systems is 0.95. The 600 -acre site is on property you already own, but improvements (1.1.1) and roads (1.1.2) will cost $1,900 per acre, and railroads (1.1.3) will cost $3,000,000. Project integration (1.9) is projected to cost 5% of all other construction costs. - The security systems (1.5.4) are expected to cost $1,300 per acre, according to recent (2019) construction of similar plants. All other support facilities and equipment (1.5) elements are to be built by Viscount Engineering. Viscount Engineering has built the support facilities and equipment elements for two similar generating plants. Their experience is expected to reduce labor requirements substantially; a 95% learning curve can be assumed. Viscount built the support facilities and equipment on their first job in 90,000 hours. For this project, Viscount's labor will be billed to you at $60 per hour. Viscount estimates that materials for the construction of the support facilities and equipment elements (except 1.5.4) will cost you $17,000,000 - The coal storage facility (1.4) for the coal-fired generating plant built in 1996 cost $4.8 million. Although your plant is smaller, you require the same size coal storage facility as the 1996 plant. You assume you can apply the cost index for similar boilers to the coal storage facility
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started