Question
Erie Company manufactures a small mp3 player called the Jogging Mate. The company uses standards to control its costs. The labor standards that have been
Erie Company manufactures a small mp3 player called the Jogging Mate. The company uses standards to control its costs. The labor standards that have been set for one Jogging Mate mp3 player are as follows:
Standard Hours | Standard Rate per Hour | Standard Cost |
30 minutes | $5.40 | $2.70 |
|
During August, 10,320 hours of direct labor time were needed to make 19,500 units of the Jogging Mate. The direct labor cost totaled $54,696 for the month.
Required:
1. According to the standards, what direct labor cost should have been incurred to make 19,500 units of the Jogging Mate? By how much does this differ from the cost that was incurred? (Round Standard labor time per unit and Standard direct labor rate to 2 decimal places.)
2. Break down the difference in cost from (1) above into a labor rate variance and a labor efficiency variance. (Indicate the effect of each variance by selecting "F" for favorable, "U" for unfavorable, and "None" for no effect (i.e., zero variance). Do not round intermediate calculations.)
3. The budgeted variable manufacturing overhead rate is $4.5 per direct labor-hour. During August, the company incurred $49,536 in variable manufacturing overhead cost. Compute the variable overhead rate and efficiency variances for the month. (Indicate the effect of each variance by selecting "F" for favorable, "U" for unfavorable, and "None" for no effect (i.e., zero variance). Do not round intermediate calculations and round your final answers to nearest whole dollar.)
Required: 1. According to the standards, what direct labor cost should have been incurred to make 19 Standard labor time per unit and Standard direct labor rate to 2 decimal places.) Number of units manufactured Standard labor time per unit Total standard hours of labor time allowed Standard direct labor rate per hour Total standard direct labor cost Actual direct labor cost Standard direct labor cost Total variance $ 2. Break down the difference in cost from (1) above into a labor rate variance and a unfavorable, and "None" for no effect (i.e., zero variance). Do not round intern Labor rate variance Labor efficiency variance 3. The budgeted variable manufacturing overhead rate is $4.5 per direct labor-hour. Duri overhead rate and efficiency variances for the month. (Indicate the effect of each varia not round intermediate calculations and round your final answers to nearest whole Variable overhead rate variance Variable overhead efficiency variance
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started