Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Estimate the hourly production (Bm/hr) of the rock excavation involved in preparing an industrial building site by drilling and blasting. The site is 89.5

image text in transcribed

Estimate the hourly production (Bm/hr) of the rock excavation involved in preparing an industrial building site by drilling and blasting. The site is 89.5 m by 120.2 m and must be excavated to an average depth of 3.658 m. The material to be excavated is thinly laminated shale. The drilling equipment to be used will consist of an air-powered track drill and air compressor. The average drilling rate, including steel changes, moves and delays, is estimated at 32 m/h. Trial blasting indicates that 7.6 cm holes drilled in a 3.658 m rectangular pattern will provide adequate fracturing. A hole depth of 4.115 m must be drilled to yield a 3.658 m effective depth.

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Information Technology Project Management

Authors: Kathy Schwalbe

6th Edition

978-111122175, 1133172393, 9780324786927, 1111221758, 9781133172390, 324786921, 978-1133153726

More Books

Students also viewed these General Management questions