Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Estimate the hourly production (Bm/hr) of the rock excavation involved in preparing an industrial building site by drilling and blasting. The site is 89.5
Estimate the hourly production (Bm/hr) of the rock excavation involved in preparing an industrial building site by drilling and blasting. The site is 89.5 m by 120.2 m and must be excavated to an average depth of 3.658 m. The material to be excavated is thinly laminated shale. The drilling equipment to be used will consist of an air-powered track drill and air compressor. The average drilling rate, including steel changes, moves and delays, is estimated at 32 m/h. Trial blasting indicates that 7.6 cm holes drilled in a 3.658 m rectangular pattern will provide adequate fracturing. A hole depth of 4.115 m must be drilled to yield a 3.658 m effective depth.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started