Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Exercise 16-48 (Algo) (Appendix used in requirement [c]) Comprehensive Cost Variance Analysis (LO 16- 5, 6, 7) Maple Leaf Production manufactures truck tires. The following

image text in transcribedimage text in transcribedimage text in transcribed

Exercise 16-48 (Algo) (Appendix used in requirement [c]) Comprehensive Cost Variance Analysis (LO 16- 5, 6, 7) Maple Leaf Production manufactures truck tires. The following information is available for the last operating period. Maple Leaf produced and sold 92,000 tires for $40 each. Budgeted production was 96,000 tires. Standard variable costs per tire follow. Direct materials: 4 pounds at $3.00 Direct labor: 0.30 hours at $15.50 Variable production overhead: 0.20 machine-hours at $18 per hour Total variable costs $12.00 4.65 3.60 $20.25 Fixed production overhead costs: Monthly budget $1,442,000 Fixed overhead is applied at the rate of $16.00 per tire. Actual production costs: Direct materials purchased and used: 391,000 pounds at $2.70 Direct labor: 21,500 hours at $15.80 Variable overhead: 19,000 machine-hours at $18.30 per hour Fixed overhead $1,055,700 339,700 347,700 1,443,000 Required: a. Prepare a cost variance analysis for each variable cost for Maple Leaf Productions. b. Prepare a fixed overhead cost variance analysis. c. (Appendix) Prepare the journal entries to record the activity for the last period using standard costing. Assume that all variances are closed to cost of goods sold at the end of the operating period. Complete this question by entering your answers in the tabs below. Required A Required B Required C Prepare a cost variance analysis for each variable cost for Maple Leaf Productions. (Indicate the effect of each variance by selecting "F" for favorable, or "U" for unfavorable. If there is no effect, do not select either option.) Direct Materials Direct Labor Variable Overhead Actual costs Actual inputs at standard price Flexible budget Price variance Efficiency variance Cost variance Required A Required B > Required A Required B Required C Prepare a fixed overhead cost variance analysis. (Indicate the effect of each variance by selecting "F" for favorable, or "U" for unfavorable. If there is no effect, do not select either option.) Total fixed overhead cost variance Required A Required C >

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Fundamentals of Cost Accounting

Authors: William Lanen, Shannon Anderson, Michael Maher

5th edition

978-1259728877, 1259728870, 978-1259565403

More Books

Students also viewed these Accounting questions