Exercise 17-6 Assigning overhead costs using the plantwide rate and departmental rate methods LO P1, P2 Laval produces lamps and home lighting fixtures. Its most popular product is a brushed aluminum desk lamp. This lamp is made from components shaped in the fabricating department and assembled in the assembly department. Information related to the 33,000 desk lamps produced annually follows. $265,000 Direct materials Direct labor Fabricating department (7,600 DLH x 529 per DLH) Assembly department (15,600 DLH X $30 per DLH) Machine hours Fabricating department Assembly department 5203,000 5468.000 15,200 21,150 FH Expected overhead cost and related data for the two production departments follow, Direct labor hours Machine hours Overhead cost Fabricating 200,00 DLH 165,000 $390,000 Assembly 360,00 DLH 122.000 H 5445,000 Required 1. Determine the plantwide overhead rate for Laval using direct labor hours as a base. 2. Determine the total manufacturing cost per unit for the aluminum desk lamp using the plantwide overhead rate 3. Compute departmental overhead rates based on machine hours in the fabricating department and direct labor hours in the assembly department 4. Use departmental overhead rates from requirement 3 to determine the total manufacturing cost per unit for the aluminum desk lamps Answer is not complete. Complete this question by entering your answers in the tabs below. Required 1 Required 2 Required 3 Required 4 Determine the total manufacturing cost per unit for the aluminum desk lamp using the plantwide overhead Direct Labor - Assembly Direct Labor - Fabricating Direct materials Overhead $ 468,000 203,000 265,000 23,000 959.000 Total manufacturing costs Units produced Manufacturing cost per unit * Answer is not complete. Complete this question by entering your answers in the tabs below. Required 1 Required 2 Required 3 Required 4 Use departmental overhead rates from requirement 3 to determine the total manufacturing cost per unit for the a desk lamps. S 265,000 Direct materials Direct labor Fabricating Assembly 203.000 468,000 671,000 Overhead Fabricating Assembly 35,872 18,848 54,720 $ 990,720 Units produced Manufacturing cost per unit 0 per unit