Exercise 2-1 Compute a Predetermined Overhead Rate (LO2-1) points Harris Fabrics computes its plantwide predetermined overhead rate annually on the basis of direct labor hours. At the beginning of the year, it estimated that 34,000 direct labor-hours would be required for the period's estimated level of production. The company also estimated $533,000 of fixed manufacturing overhead cost for the coming period and variable manufacturing overhead of $2.00 per direct labor-hour. Harris's actual manufacturing overhead cost for the year was $661,588 and its actual total direct labor was 34,500 hours Skipped Required: Compute the company's plantwide predetermined overhead rate for the year. (Round your answer to 2 decimal places.) Predetermined overhead per DLH References Chapter 2 HW O Exercise 2-3 Computing Total Job Costs and Unit Product Costs Using a Plantwide Predetermined Overhead Rate (LO2-3) points Mickley Company's plantwide predetermined overhead rate is $19.00 per direct labor-hour and its direct labor wage rate is $14.00 per hour. The following information pertains to Job A-500: Sed $ 250 Direct materials Direct labor Required: 1. What is the total manufacturing cost assigned to Job A-500? 2. If Job A-500 consists of 40 units, what is the unit product cost for this job? (Round your answer to 2 decimal places.) 1. Total manufacturing cost 2. Unit product cost Chapter 2 HW Help S. Exercise 2-4 Computing Total Job Costs and Unit Product Costs Using Multiple Predetermined Overhead Rates [LO2-4) Fickel Company has two manufacturing departments-Assembly and Testing & Packaging. The predetermined overhead rates in Assembly and Testing & Packaging are $21.00 per direct labor-hour and $17.00 per direct labor-hour, respectively. The company's direct labor wage rate is $23.00 per hour. The following information pertains to Job N-60: Skipped Testing & Packaging Deer Direet laber Assembly $385 $ 207 Required: 1. What is the total manufacturing cost assigned to Job N-607(Do not round Intermediate calculations.) 2. If Job N-60 consists of 10 units, what is the unit product cost for this job? (Do not round intermediate calculations. Round your answer to 2 decimal places.) 1. Tomanarung cost 2 Unit product cost