Question

1 Approved Answer

Exercise 5-27 (Static) Methods of Estimating Costs: Engineering Estimates (LO 5-1, 2) Collingwood Contractors (CC) designs and builds new model homes for individual customers.

image text in transcribedimage text in transcribedimage text in transcribed

Exercise 5-27 (Static) Methods of Estimating Costs: Engineering Estimates (LO 5-1, 2) Collingwood Contractors (CC) designs and builds new model homes for individual customers. CC has developed a reputation in the market for relatively upscale, unique designs with high-end finishings. CC has developed several formulas, which it uses to estimate costs and provide price quotes for prospective buyers. These include costs for materials, labor, and other resources. Although multiple configurations are possible for any house, CC uses three levels (or tiers) to represent increasing levels of luxury in terms of materials used. In addition, the customer can choose among three levels of increasingly sophisticated appliances and other house equipment. Finally, there is cost to bring utilities (electricity, water, and so on) to the house if required. Of course, these estimates are dependent on the region of the country and whether the lot is located in a city or in a suburb or rural area. If the building site is in a city, a premium is added based on the building and equipment costs. The following are the cost estimates for one region in the Northwest: Design and administrative costs Building costs per square foot (Tier I) Building costs per square foot (Tier II) Building costs per square foot (Tier III) Equipment (appliances, and so on) -- Ruby Equipment (appliances, and so on) Equipment (appliances, and so on) Utilities required? If yes, ... Sapphire Emerald City premium (applied to building and equipment costs) Required: $ 35,000 110 180 235 18,000 27,000 36,000 39,000 15% a. A customer has expressed interest in having CC build a Tier III, 4,500-square-foot home. The building site is a city lot and the customer wants the Sapphire level equipment. Based on the engineering estimates above, what will such a house cost to build? No additional utilities access is required. b. Another customer has expressed interest in having CC build a smaller, Tier I, home, but with emerald-level equipment. This home will be on a vacant lot in the country and require utilities access to be added. The customer has chosen a 2,200-square-foot design. Based on the engineering estimates above, what will such a house cost to build?

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Intermediate Accounting

Authors: David Spiceland

11th Edition

1264134525, 9781264134526

Students also viewed these Accounting questions

Question

Interpret the proportion of true As and the proportion of false As.

Answered: 1 week ago