Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Given Standard and Modified Proctor compaction test results for a soil. The contract specifications require a dry density of at least 113 pcf and
Given Standard and Modified Proctor compaction test results for a soil. The contract specifications require a dry density of at least 113 pcf and a water content of 16% +/- 1%. Standard Proctor ASTM D698 12,375 ft-lb/ft w (%) 11.8% 13.6% 15.7% 17.7% 19.6% 20.8% Field test a b Ydry (pcf) C d 100.2 102.8 105.3 106.4 103.7 100.8 Plot moisture versus Yary for the Proctor test data. Also plot compactive effort (log scale) vesus Ydry Use the two plots to analyze field density samples b, c and d, and fill out the table showing how to modify the water content and compaction effort to meet specifications (use the format shown for sample a). Ydry (pcf) Modified Proctor ASTM D1557 56,250 ft-lb/ft 115.0 111.0 108.0 111.0 w (%) 11.0% 12.0% 13.6% 14.8% 16.1% 17.2% Ydry Y (pcft w (%) 12.5% 13.5% 18.0% 17.3% 114.3 115.8 117.6 117.9 116.5 114.5 Change water content (w) +3.5% Change Compaction - 40%
Step by Step Solution
★★★★★
3.34 Rating (154 Votes )
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started