Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Factory Overhead Cost Variances Thomas Textiles Corporation began November with a budget for 44,000 hours of production in the Weaving Department. The department has a

Factory Overhead Cost Variances

Thomas Textiles Corporation began November with a budget for 44,000 hours of production in the Weaving Department. The department has a full capacity of 59,000 hours under normal business conditions. The budgeted overhead at the planned volumes at the beginning of November was as follows:

Variable overhead $140,800
Fixed overhead 100,300
Total $241,100

The actual factory overhead was $244,000 for November. The actual fixed factory overhead was as budgeted. During November, the Weaving Department had standard hours at actual production volume of 46,000 hours.

Determine the variable factory overhead controllable variance and the fixed factory overhead volume variance. Enter a favorable variance as a negative number using a minus sign and an unfavorable variance as a positive number. Round your interim computations to the nearest cent, if required.

a. Variable factory overhead controllable variance:

b. Fixed factory overhead volume variance:

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

The Social Work Ethics Audit A Risk Management Tool

Authors: Frederic G. Reamer

1st Edition

0871013282, 978-0871013286

More Books

Students also viewed these Accounting questions

Question

socialist egalitarianism which resulted in wage levelling;

Answered: 1 week ago

Question

soyuznye (all-Union, controlling enterprises directly from Moscow);

Answered: 1 week ago