Question
Fairbanks Corporation produces two types of cell phone electronic chargers: wall chargers and car chargers. The current traditional costing system allocates overhead costs using a
Fairbanks Corporation produces two types of cell phone electronic chargers: wall chargers and car chargers. The current traditional costing system allocates overhead costs using a plant-wide overhead rate based on direct labor hours. Since the two products are similar but require different parts and processes, the company controller believes that it might make sense to employ activity-based costing in order to get a better application of overhead expenses to the products produced. Production expectations for 2017 are 17,000 wall chargers and 15,200 car chargers. The wall chargers take .5 hours to produce. The car chargers take .75 hours to produce. The direct material and direct labor costs included in the two products are as follows: Wall chargers use $3.75 of direct material per unit and $9.50 per hour of direct labor. Car chargers use $4.15 of direct material per unit and $9.50 per hour of direct labor. Each charger sells for $23.00. Budgeted Total Factory Overhead for 2017: Activity Est. OH Cost Est. Volume Levels Production setup $8,500 20 setups Materials handling $62,000 4,500 lbs. Packaging and shipping $120,000 6,400 boxes Total factory overhead $190,500 Fairbanks controller worked with the operations group to analyze the three overhead activities in order to effectuate activity-based costing. The estimates related to the two products requirements were: Activity Wall Charger Car Charger Production setup 35% 65% Materials handling 60% 40% Packaging and shipping 55% 45% From the cost information provided, provide responses in Microsoft Excel to the following questions. Reference Lynda.com in the CSU-Global Library (Links to an external site.) for Microsoft Excel tutorials or use the Excel Tutorials link found in the classroom if assistance is needed. Compare the net profit margin of the products under the simple/traditional cost assignment and the ABC assignment for each product. Evaluate the difference. that the controller might deliver to management to justify the use of ABC for these two products.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started