Five jobs are required to be completed in a two - machine flow shop and their respective needed times areshown in the next table. Each
Five jobs are required to be completed in a twomachine flow shop and their respective needed times areshown in the next table. Each job must begin with machine A and finish with machine BTime minutesJob Machine A Machine B
a Determine the sequence that will minimize the makespan.
b Construct a load Gantt chart for the resulting sequence and find machine As idle time.
c For the sequence determined in part a can machine As idle time be reduced by splitting some jobsin half? If so which jobs?
d Split jobs and and draw the new load Gantt chart.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started