For labour cost in the lab: a . Compute a labour rate variance and a labour efficiency variance. ( Do not round intermediate calculations. Round

For labour cost in the lab:
a. Compute a labour rate variance and a labour efficiency variance. (Do not round intermediate calculations. Round "Efficiency variance" answer to 2 decimal places. Indicate the effect of each variance by selecting "F" for favourable, "U" for unfavourable, and "None" for no effect (i.e., zero variance).)
\table[[Labour rate variance,,],[Labour efficiency variance,,]]
1
Jacqui Bassett, chief administrator for the city hospital, is concerned about costs for tests in the hospital's lab. Bassett has asked you to evaluate costs for the past month. The following information is available:
a. Basically, two types of tests are performed in the lab: blood tests and smears. During the past month, 1,890 blood tests and 2,520 smears were performed in the lab.
65 points
References
b. Small glass plates are used in both types of tests. During the past month, the hospital purchased 12,600 plates at a cost of $25,200. This cost is net of a 6% quantity discount. 1,260 of these plates were still on hand unused at the end of the month; there were no plates on hand at the beginning of the month.
c. During the past month, 1,200 hours of labour time were recorded in the lab. The cost of this labour time was $14,100.
d. Variable overhead cost last month in the lab for utilities and supplies totalled $7,440.
The hospital has never used standard costs. By searching industry literature, however, you have determined the following nationwide averages for hospital labs:
Plates: Two plates are required per lab test. These plates cost $2.15 each and are disposed of after the test is completed.
Labour: Each blood test should require 0.30 hour to complete, and each smear should require 0.15 hour to complete. The average cost of this lab time is $14.00 per hour.
Overhead: Overhead cost is based on direct labour-hours. The average rate for variable overhead is $5.00 per hour.
Bassett would like a complete analysis of the cost of plates, labour and overhead in the lab for the last month so that she can get to the root of the lab's cost problem.
Required:
Compute a materials price variance for the plates purchased last month and a materials quantity variance for the plates used last month. (Indicate the effect of each variance by selecting "F" for favourable, "U" for unfavourable, and "None" for no effect (i.e., zero variance).)
Activate Windows
1
65
points
2. For labour cost in the lab:
References
a. Compute a labour rate variance and a labour efficiency variance. (Do not round intermediate calculations. Round "Efficiency variance" answer to 2 decimal places. Indicate the effect of each variance by selecting "F" for favourable, "U" for unfavourable, and "None" for no effect (i.e., zero variance).)
\table[[Labour rate variance,,],[Labour efficiency variance,,]]

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Students also viewed these Accounting questions