Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

For the following problems consider a copy center that produces packets for sale to students. There are three workstations: copying, stapling, and three-hole drilling. 1.

For the following problems consider a copy center that produces packets for sale to students. There are three workstations: copying, stapling, and three-hole drilling.

1. The copy center has a job order for packets composed of 500 pages of copies on white paper and 200 pages on pink paper. The copying rate is 25 pages per minute, the overall setup time is 5 minutes, and the color change time is 2 minutes. What is the expected capacity requirement for the copy machine center to do this job?

2. The routing for the job in Problem 1 also calls for stapling and three-hole drilling in that order. The time standards are 10 and 20 minutes respectively. If labor cost is charged based on total standard time multiplied by $6 per hour, estimate the cost of this job, including the work in Problem 1.

3. Suppose the copy center only did jobs exactly like this one. What would the cycle rate be? Assume that each of the three work centers has its own employee. (Hint: draw a flow chart showing the progression of each order over time.)

4. What is the maximum number of such jobs that can be produced in a 40-hour week? What is the labor cost per job?

5. What is the capacity utilization of each of the three work centers when the operating unit works at the maximum rate as determined in problem 4?

6. How would the answers to problems 3 and 4 change if a second copy machine was added, staffed with its own worker. The two copiers operate independently, feeding their output to the stapling operation.

7. What is the throughput time for jobs in the above scenario?

8. How would the answers to problems 3 and 4 change if the batch size is doubled (assume copying run time and setup times remain as defined earlier)?

9. If there are 20 jobs on the average in inventory, and the copy center turns out 50 jobs per month, what is the inventory turnover rate?

10. Suppose that in problem 1, 750 sheets of paper were required in order to complete the job. What is the yield? the scrap rate?

11. As a customer, what criteria might you use to evaluate the quality of the copy center's product and service?

I need to know the answer for Question 6

Thanks

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Making Hard Decisions with decision tools

Authors: Robert Clemen, Terence Reilly

3rd edition

538797576, 978-0538797573

More Books

Students also viewed these Mathematics questions

Question

(Does thinking of ?y bring anything else t o mind?)

Answered: 1 week ago