For the Push - Run ( focused on utilization and producing as much as possible ) 1 . Plot ideal Throughput vs WIP ( iTH
For the PushRun focused on utilization and producing as much as possible
Plot ideal Throughput vs WIP iTHWIP and Leadtime versus WIP iLTWIP curves for the runs
Use the average processing times measured during the runs.
On the iTHWIP and iLTWIP plots above:
a Plot the performance of a line with very high variability.
b Plot the measured performance of the assembly line.
c Plot the calculated performance of the assembly line using the measured interarrival
times and processing times.
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started