Question
Furniture Face Lift refinishes old wood furniture. Their process for refinishing chairs has6 workers and 4 stations. Each chair starts at the Stripping station, then
Furniture Face Lift refinishes old wood furniture. Their process for refinishing chairs has6 workers and 4 stations. Each chair starts at the Stripping station, then goes to Priming, then to Painting and finally to Inspection. Where there are multiple workers within a station, each worker works independently on his/her own chair. Assume inventory buffers are allowed between each station. Station Staffing Processing time (hours per chair per worker) Stripping 1 2.5 0.40 Bottlenecks Priming 2 1.5 1.33 Painting 2 1.75 1.14 Inspection 1 0.8 1.25 Total process 6.55 Suppose at the start of the day there is no inventory of chairs in the shop. That is, there are no chairs within any of the stations or between them in any buffer. A truck loaded with 15chairs arrives. How manyhourswill it take them to complete these 15chairs?(The accuracy should be of two digits after the decimal places.)
As stripping has the lowest capacity, thus it will be having bottleneck, therefore the process capacity is 1.2
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started