Given the following data / information, determine the elevation of the weir crest at the river (8 marks): Ground level at head of scheme =

Given the following data / information, determine the elevation of the weir crest at the river (8 marks):

  • Ground level at head of scheme = 2000 m amsl;
  • Operation head = 0.50 m
  • Canal length to head works = 5.0 km
  • Slope of the canal = 0.5%
  • Head loss across structures = 1.50m
  • Head loss at intake = 0.10m

If the weir height is 1.0m, what is the river bed level at the head works?

Step by Step Solution

3.48 Rating (151 Votes )

There are 3 Steps involved in it

Step: 1

The detailed answer for the above question is provided below Head of scheme 20000 WL hea... blur-text-image
Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Fundamentals Of Hydraulic Engineering Systems

Authors: Robert J. Houghtalen, A. Osman H. Akan, Ned H. C. Hwang

4th Edition

136016383, 978-0136016380

More Books

Students explore these related Civil Engineering questions