Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports

image text in transcribed

image text in transcribed

image text in transcribed

image text in transcribed

Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data. Direct materials Direct labor Overhead (300% of direct labor cost) Total cost Quantity produced Average cost per ft. (rounded) Rounded Edge $ 9,500 6,000 18,000 $33,500 10,600 ft. $ 3.16 Squared Edge Total $21,700 $ 31,200 11,900 17,900 35,700 53,700 $69,300 $102,800 14,200 ft. $ 4.88 Glassworks's controller wishes to apply ctivity-based (ABC) to allocate the $53,700 of overhead costs incurred by the two product lines to see whether cost per foot would change markedly from that reported above. She has collected the following information. Cost Overhead Cost Category (Activity Cost Pool) Supervision Depreciation of machinery Assembly line preparation Total overhead $ 2,148 28,680 22,872 $ 53,700 She has also collected the following information about the cost drivers for each category (cost pool) and the amount of each driver used by the two product lines. (Round activity rate and cost per unit answers to 2 decimal places.) Usage Overhead Cost Category (Activity Cost Pool) Supervision Depreciation of machinery Assembly line preparation Driver Direct labor cost ($) Machine hours Setups (number) Rounded Edge $6,000 300 hours 32 times Squared Edge $11,900 700 hours 95 times Total $17,900 1,000 hours 127 times Required: 1. Assign these three overhead cost pools to each of the two products using ABC. Overhead Cost Activity Drivers Activity Rate Activity Supervision Direct labor cost % Machine hours Depreciation of machinery Assembly line preparation Setups Rounded edge Activity rate Activity driver incurred Overhead assigned % Supervision Depreciation of machinery Assembly line preparation Squared edge Activity rate Activity driver incurred Overhead assigned Components Supervision Depreciation of machinery Assembly line preparation 2. Determine average cost per foot for each of the two products using ABC. Rounded edge Squared edge

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Auditing In The Public Sector Efficiency Economy And Program Results

Authors: James L. Savage, Felix Pomeranz, Alfred J. Cancellieri, Joseph B. Stevens

1st Edition

0882621238, 978-0882621234

More Books

Students also viewed these Accounting questions