Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports

Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data.

Rounded Edge Squared Edge Total
Direct materials $ 9,500 $ 21,700 $ 31,200
Direct labor 6,100 11,800 17,900
Overhead (300% of direct labor cost) 18,300 35,400 53,700
Total cost $ 33,900 $ 68,900 $ 102,800
Quantity produced 10,500 ft. 14,100 ft.
Average cost per ft. (rounded) $ 3.23 $ 4.89

Glassworks's controller wishes to apply activity-based costing (ABC) to allocate the $53,700 of overhead costs incurred by the two product lines to see whether cost per foot would change markedly from that reported above. She has collected the following information.

Overhead Cost Category (Activity Cost Pool) Cost
Supervision $ 2,148
Depreciation of machinery 28,680
Assembly line preparation 22,872
Total overhead $ 53,700

She has also collected the following information about the cost drivers for each category (cost pool) and the amount of each driver used by the two product lines. (Round activity rate and cost per unit answers to 2 decimal places.)

Usage
Overhead Cost Category (Activity Cost Pool) Driver Rounded Edge Squared Edge Total
Supervision Direct labor cost ($) $ 6,100 $ 11,800 $ 17,900
Depreciation of machinery Machine hours 300 hours 700 hours 1,000 hours
Assembly line preparation Setups (number) 31 times 93 times 124 times
image text in transcribed
Required: 1. Assign these three overhead cost pools to each of the two products using ABC. Overhead Cost Activity Drivers Activity Rate Activity Supervision Depreciation of machinery Assembly line preparation Direct labor cost Machine hours Setups Rounded edge Activity rate Activity driver incurred Overhead assigned Supervision Depreciation of machinery Assembly line preparation Activity rate Activity driver incurred Overhead assigned Squared edge Components Supervision Depreciation of machinery Assembly line preparation 2. Determine average cost per foot for each of the two products using ABC. Rounded edge Squared edge

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Financial Accounting

Authors: Michael J. Jones

2nd Edition

1119977150, 978-1119977155

More Books

Students also viewed these Accounting questions