Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports

Glassworks Inc. produces two types of glass shelving, rounded edge and squared edge, on the same production line. For the current period, the company reports the following data.

Rounded Edge Squared Edge Total
Direct materials $ 9,600 $ 21,800 $ 31,400
Direct labor 6,100 11,800 17,900
Overhead (300% of direct labor cost) 18,300 35,400 53,700
Total cost $ 34,000 $ 69,000 $ 103,000
Quantity produced 10,400 ft. 14,200 ft.
Average cost per ft. (rounded) $ 3.27 $ 4.86

Glassworks's controller wishes to apply activity-based costing (ABC) to allocate the $53,700 of overhead costs incurred by the two product lines to see whether cost per foot would change markedly from that reported above. She has collected the following information.

Overhead Cost Category (Activity Cost Pool) Cost
Supervision $ 2,148
Depreciation of machinery 28,680
Assembly line preparation 22,872
Total overhead $ 53,700

She has also collected the following information about the cost drivers for each category (cost pool) and the amount of each driver used by the two product lines. (Round activity rate and cost per unit answers to 2 decimal places.)

Usage
Overhead Cost Category (Activity Cost Pool) Driver Rounded Edge Squared Edge Total
Supervision Direct labor cost ($) $ 6,100 $ 11,800 $ 17,900
Depreciation of machinery Machine hours 400 hours 800 hours 1,200 hours
Assembly line preparation Setups (number) 32 times 94 times 126 times
1. Assign these three overhead cost pools to each of the two products using ABC.
Activity Overhead Cost Activity Drivers Activity Rate
Supervision Direct labor cost %
Depreciation of machinery Machine hours
Assembly line preparation Setups
Rounded edge Activity rate Activity driver incurred Overhead assigned
Supervision %
Depreciation of machinery
Assembly line preparation
Squared edge Activity rate Activity driver incurred Overhead assigned
Components
Supervision %
Depreciation of machinery
Assembly line preparation
2. Determine average cost per foot for each of the two products using ABC.
Rounded edge Squared edge

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Optimization Methods In Finance

Authors: Gérard Cornuéjols, Javier Peña, Reha Tütüncü

2nd Edition

1107056748, 9781107056749

More Books

Students also viewed these Accounting questions