Question
Harrison Company makes two products and uses a conventional costing system in which a single plantwide, predetermined overhead rate is computed based on direct labour-hours.
Harrison Company makes two products and uses a conventional costing system in which a single plantwide, predetermined overhead rate is computed based on direct labour-hours. These products are customized to some degree for specific customers. Data for the two products for the upcoming year follow:
Rascon Parcel Direct materials cost per unit $ 29.50 $ 23.50 Direct labour cost per unit $ 24.30 $ 4.80 Direct labour-hours per unit 0.90 0.30 Number of units produced 29,000 119,000
Required:
1. The companys manufacturing overhead costs for the year are expected to be $861,000. Using the companys traditional costing system, compute the unit product costs for the two products. (Do not round intermediate calculations and round your final answers to 2 decimal places.)
Rascon Parcel Unit product cost xx xx
Management is considering an ABC system in which half of the overhead would continue to be allocated on the basis of direct labour-hours and half would be allocated on the basis of engineering design time. This time is expected to be distributed as follows during the upcoming year:
Rascon Parcel Total Engineering design time (in hours) 6,400 3,200 9,600
Compute the unit product costs for the two products using the proposed ABC system
Rascon Parcel Unit product cost xx xx
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started