Hartley Electronics, Inc in Nashville, produces short runs of custom airwave scanners for the defense industry You have been asked by the owner, Janet Hartley to reduce inventory by introducing a kanban system. After several hours of analysts, you develop the following data for scanner connectors used in one work cell How many kanbans do you need for this connector? Daily demand 1,000 connectors Lead time 2 days Safely stock 050 day Kanban so 500 connectors Number of kanbans kanbans (round your response to the newest whole number) Carol Cagle has a repetitive manufacturing plant producing trailer hitches in Arlington, Texas The plant has an average inventory turnover of only 12 times per year. He has therefore determined that he will teduce his component lot sizes. He has developed the following data for one component, the safety chain clip Setup labor cost $25 per hour Annual holding cost S13 per unit Daily production 960 units/8 hour day Annual demand 43 830 (260 days each x daily demand of 168 units) Desired lot size 120 unids (one hour of production) To obtain the desired lot size, the set-up time that should be achieved minutes fround your response to two decimal places) Carol Cagle has a repetitive manufacturing plant producing trailer hitches in Arlington, Texas. The plant has an average inventory turnover of only 12 times per year. He has therefore determined that he will reduce his component lot sizes He has developed the following data for one component, the safety chain clip Setup labor cost $25 per hour Annual holding cost $13 per unit Daily production 960 units/8 hour day Annual demand 43,680 (260 days cach x daily demand of 168 units) Desired lot size 120 units (one hour of production) To obtain the desired lot size, the set-up time that should be achieved = minutes (round your response to two decimal places) Hartley Electronics Inc in Nashville, produces short runs of custom airwave scanners for the defense industry. You have been asked by the owner, Janet Hartley, to reduce inventory by introducing a kanban system After several hours of analysis, you develop the following data for scanner connectors used in one work cell How many kanbans do you need for this connector? Daily demand Lead time Safety stock Kanban size 1,000 connectors 2 days 0.50 day 500 connectors Number of kanbans kanbans (round your response to the nearest whole number)