Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Hello can you please answer the following questions, thanks :) Question 5: When building in a bushfire-prone region, there are a number of precautions that

Hello can you please answer the following questions, thanks :) Question 5: When building in a bushfire-prone region, there are a number of precautions that a builder is required to take in the design of the building, the type of materials used, and the position of the building on the property. Briefly discuss the three requirements. A. Design of the building: B. Type of materials to be used: C. Position of the building on the property: Question 6: The roof framing of a residential building can be a truss system or a traditional (cut) system. A. Discuss the advantages and disadvantages of using the truss system for the roof framing of a residential building. B. Discuss the advantages and disadvantages of using the traditional system for the roof framing of a residential building. Question 7: Passive Solar Design (PSD) is an important concept that must be considered by builders when designing a residential building. You are a builder planning to build a house in Sydney on a 600 square metre rectangular block. A. How would you orientate the house on the site? B. Explain why you would orientate the house according to your answer in part (a) above. Question 8 : Slab-on-ground is commonly used when building a house. Another method is to use footings and foundations with a timber-framed floor. Discuss: A. (i) The advantages of using slab-on-ground. (i)The disadvantages of using slab-on-ground. B. (i) The advantages of using footings and foundations with a timber-framed floor. (i) The disadvantages of using footings and foundations with a timber-framed floor. Question 9 : A number of design elements are incorporated into domestic construction to prevent water from entering a building. Five of these are listed below. Briefly explain how each one prevents water from entering the building. A: The rebate or step on a concrete slab. B: The valley on a hip and valley roof. C: The cavity between the brick wall and the timber frame of a brick veneer dwelling. D:The damp-proof course (DPC) in the foundations of a dwelling. E:The plastic membrane placed under a concrete slab. Question 10: Contrast the advantages and disadvantages of a timber frame versus steel frame for typical project home construction

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Strategic Management

Authors: Cornelius A. De Kluyver

1st Edition

1631570730, 978-1631570735

More Books

Students also viewed these General Management questions

Question

2. (1 point) Given AABC, tan A b b

Answered: 1 week ago