Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

Hello, I need help with this question please Thank you Calculate Lead Time Flint Fabricators Inc. machines metal parts for the automotive industry. Under the

image text in transcribed

Hello, I need help with this question please Thank you

Calculate Lead Time Flint Fabricators Inc. machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes: milling and finishing. Parts are produced in batch sizes of 75 parts. A part requires 5 minutes in milling and 8 minutes in finishing. The move time between the two operations for a complete batch is 9 minutes. Under the lean philosophy, the part is produced in a cell that includes both the milling and finishing operations. The operating time is unchanged; however, the batch size is reduced to 3 parts and the move time is eliminated. Determine the value-added, non-value-added, and total lead times, and the value added ratio under the traditional and lean manufacturing methods. If required, round percentages to one decimal place. Traditional Philosophy Lean Manufacturing Philosophy Value-added time Non-value-added time Total lead time min Value-added ratio (as a percent) min min min min min % % 7 12:59 AM 5/20/2020 hp

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Puzzling Auditing Puzzles

Authors: Janice P. Russell

1st Edition

0873894782, 978-0873894784

More Books

Students also viewed these Accounting questions