Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

helpp Value Added and Non-Value Added Costs, Unused Capacity For Situations 1 through 6, provide the following information: a. An estimate of the non-value-added cost

helpp
image text in transcribed
image text in transcribed
Value Added and Non-Value Added Costs, Unused Capacity For Situations 1 through 6, provide the following information: a. An estimate of the non-value-added cost caused by each activity. If required, round your final answer to the nearest dollar. b. The root causes of the activity cost (such as plant layout, process design, and product design). C. The appropriate cost reduction measure: activity elimination, activity reduction, activity sharing, or activity selection. Choose " Multiple" in the Root cause column, wherever there is more than one root cause. 1. It takes 42 minutes and fifteen pounds of material to produce a product using a traditional manufacturing process. A process reengineering study provided a new manufacturing process design (using existing technology) that would take 12 minutes and 10 pounds of material. The cost per labor hour is $10, and the cost per pound of material is $12. 2. With its original design, a product requires 14 hours of setup time. Redesigning the product could reduce the setup time to an absolute minimum of 28 minutes. The cost per hour of setup time is $240. 3. A product currently requires fourteen moves. By redesigning the manufacturing layout, the number of moves can be reduced from fourteen to zero. The cost per move is $14. 4. Inspection time for a plant is 5,000 hours per year. The cost of inspection consists of salaries of four inspectors, totaling $140,000. Inspection also uses supplies costing $23 per inspection hour. A supplier evaluation program, product redesign, and process redesign reduced the need for inspection by creating a zero-defect environment. 5. Each unit of a product requires eighteen components. The average number of components is 18.3 due to component failure, requiring rework and extra components. By developing relations with the right suppliers and increasing the quality of the purchased component, the average number of components can be reduced to five components per unit. The cost per component is $1,400. 6. A plant produces 100 different electronic products. Each product requires an average of 20 components that are purchased externally. The components are different for each part. By redesigning the products, it is possible to produce the 100 products so that they all have 10 components in common. This will reduce the demand for purchasing, receiving, and paying bills. Estimated savings from the reduced demand are $220,000 per year. Non-Value-Added Cost Case Root Cause Cost Reduction process reengineering study provided a new manufacturing process design (using existing technology) that would take tz minutes and 10 pounds of material. The cost per labor hour is $10, and the cost per pound of material is $12. 2. With its original design, a product requires 14 hours of setup time. Redesigning the product could reduce the setup time to an absolute minimum of 28 minutes. The cost per hour of setup time is $240. 3. A product currently requires fourteen moves. By redesigning the manufacturing layout, the number of moves can be reduced from fourteen to zero. The cost per move is $14. 4. Inspection time for a plant is 5,000 hours per year. The cost of inspection consists of salaries of four inspectors, totaling $140,000. Inspection also uses supplies costing $23 per inspection hour. A supplier evaluation program, product redesign, and process redesign reduced the need for inspection by creating a zero-defect environment. 5. Each unit of a product requires eighteen components. The average number of components is 18.3 due to component Failure, requiring rework and extra components. By developing relations with the right suppliers and increasing the quality of the purchased component, the average number of components can be reduced to five components per unit. The cost per component is $1,400. 6. A plant produces 100 different electronic products. Each product requires an average of 20 components that are purchased externally. The components are different for each part. By redesigning the products, it is possible to produce the 100 products so that they all have 10 components in common. This will reduce the demand for purchasing, receiving, and paying bills. Estimated savings from the reduced demand are $220,000 per year. Case Non-Value-Added Cost Root Cause Cost Reduction 1 360 per unit 2 per setup - 3 per unit 4 per year 5 per unit per year

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Corporate Financial Accounting

Authors: Carl S Warren, Jeff Jones

16th Edition

0357510380, 978-0357510384

More Books

Students also viewed these Accounting questions

Question

=+Describe the perceptual signs of voice and resonance disorders

Answered: 1 week ago