Answered step by step
Verified Expert Solution
Question
1 Approved Answer
Hi there! Please help me with this question, solving all parts. Someone had already posted it, but the answer was short and incorrect. Thanks! A
Hi there! Please help me with this question, solving all parts. Someone had already posted it, but the answer was short and incorrect. Thanks!
A job shop operates three 8-hour shifts per day, five days per week and produces five part styles using three station types, two of which have multiple servers. Part-mix ratios, batch quantities, part routings, machines, servers, setup times and cycle times are given in the table below for the four part styles produced in the shop. Operation sequence for each part style is in the order of station number. Part styles are identified by letter and stations are identified by number. Determine (a) which station is the bottleneck. (b) total weekly output of all five parts. (c) weekly outputs for each of the part styles, (d) utilization of each server at each station, and (e) average utilization of the machine shop. Part style () A B D Part mix p. 0.15 0.20 0.10 0.30 Batch quantities o 20 25 12 Stations Servers T. Tho TE (1) (hr) (hr) (hr) (hr) (hr) (hr) (hr) (hr) (hr) (hr) 3 0.16 0.3 2 0.20 0.25 3.0 0.2 E 0.25 10 30 Tra Ta Tic THE 51 2.0 1 2 3 3.0 2.0 4.0 0.2 0.3 2.0 5.0 0.1 0.2 1.0 2.0 4.0 2.0 4.0 0.4 0.2 0.1 1 A job shop operates three 8-hour shifts per day, five days per week and produces five part styles using three station types, two of which have multiple servers. Part-mix ratios, batch quantities, part routings, machines, servers, setup times and cycle times are given in the table below for the four part styles produced in the shop. Operation sequence for each part style is in the order of station number. Part styles are identified by letter and stations are identified by number. Determine (a) which station is the bottleneck. (b) total weekly output of all five parts. (c) weekly outputs for each of the part styles, (d) utilization of each server at each station, and (e) average utilization of the machine shop. Part style () A B D Part mix p. 0.15 0.20 0.10 0.30 Batch quantities o 20 25 12 Stations Servers T. Tho TE (1) (hr) (hr) (hr) (hr) (hr) (hr) (hr) (hr) (hr) (hr) 3 0.16 0.3 2 0.20 0.25 3.0 0.2 E 0.25 10 30 Tra Ta Tic THE 51 2.0 1 2 3 3.0 2.0 4.0 0.2 0.3 2.0 5.0 0.1 0.2 1.0 2.0 4.0 2.0 4.0 0.4 0.2 0.1 1Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started