Answered step by step
Verified Expert Solution
Question
1 Approved Answer
ho to get number of holes Ig to the attached diagram, design a drilling, charging and timing layout for the dim alculate the actual metres
ho to get number of holes
Ig to the attached diagram, design a drilling, charging and timing layout for the dim alculate the actual metres drilled, explosives required, initiations system required, th factor and the cost per cubic metre. Based on basic design principles, show all the cons id motivate your decisions. (No software computer designs will be accepted) use of the following: mulsion for charging holes: 1.12g/cc(R8.90/kg) onic delay detonators: R265 per unit er: R58.25 per unit ic harness wire: R1.77/metre g cost per metre: R74.5/m r: R12.70 per unit ly show all your assumptions. Quartzite - Hard competent rock Ig to the attached diagram, design a drilling, charging and timing layout for the dim alculate the actual metres drilled, explosives required, initiations system required, th factor and the cost per cubic metre. Based on basic design principles, show all the cons id motivate your decisions. (No software computer designs will be accepted) use of the following: mulsion for charging holes: 1.12g/cc(R8.90/kg) onic delay detonators: R265 per unit er: R58.25 per unit ic harness wire: R1.77/metre g cost per metre: R74.5/m r: R12.70 per unit ly show all your assumptions. Quartzite - Hard competent rockStep by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started