Honeslty, I just cant figure this out at all and im stressing fr. please help ill send what i can throught that cashapp
You work for Thunderduck Custom Tables inc. This is the first month of operations. The company designs and manufactures specially tables. Each table is specially customized for the customer. This month, you have been asked to deveiop and manufacture two new tables for customers. You wil design and build the tables. The company does not have indirect matarials. You will be keeping track of the costs incurred to manufacture the tables using Job 11 Cost Sheet and Jab \#2 Cost Sheet. The cost of the direct materials that can be used to manufacture the table are as follows. Assume a 550 per hour wage rate to the assembly emplayees. The company uses a job order costing system and applies manufacturing overhead to jobs based on direct labor hours. The company estimates that there will be 120 direct labor hours worked during the month. Data 2 The first order you recelved was to manufacture a table using a table top and four legs. This is your Job A1. Data 3 The customer that has ordered Job H2, wants a table that is the same as Job H1, but wants to also add a drawer to the table. Step 1 The following is a list of transactions that need to be recorded for the company for activity in the month of December. Record those in the "General Journar" tab of the excel file using the proper format. Please use the following accounts: 1.Dec Raw materials purchased on account, $18,000 5.Doc All Raw materials needed for Job $1 were requested from the material storage for use during the month. All mattrials are direct. (After you joumalize this entry please enter the information into Job 1 Cost Sheet) 10-Dec The following employee costs were incurred but not paid during the month: Direct labor for Job \#1, consisted of 60 hours at a rate of $50 per hour, totaling $3,000. (After you journalize this entry please entar the information into Job 11 Cost Sheet) Satary for eupervisor of the factory $2,500. Administrative Salary $1,700. 12. Dec Manufacturing overhead cost was applied based on direct labor hours to Job \#t using the POHR calculated in Question 1. (After you joumalize this entry please enter the information into Job \#1 Cost Sheet) 15-Dec All Raw materials needed for Job \#2 were requested from the material storage for use during the month. All materials are direct. (After you joumalize this entry please enter the information into Job H2 Cost Sheet) 16-Dec Rent for the month of December for the factory bullding incurred but not paid $1,400. 17.Dec Advertising cests incurred but not paid for the month was $1,600. 20-Dec Depreciation for the month of Decembor was recorded on equipment $1,550 ( $1,200 for equipment used in the factory and $350. for equipment used in selling and administrative activities) 24-Dec Property insurance incurred but not paid $2,500 (\$2,100 for the factory and $400 for selling and administrative offices). 26.Dec Job \#1 was completed and transferred to Finished Goods during the month. 28-Dec The completed table was sold on account to the customer for $23,000 during the month. (Hint: Make sure to account for the cost of the table that was sold using the cost from the job cost sheet.) 31-Dec By the end of the month, 30 hours of direct labor wore incurred at a rate of $50 per hour, totaling $1,500 to begin production on job 2. The emplayees will be paid next month. (After you journalize this entry please enter the information into Job \#2 Cost Sheet) 31-Dec. Manutacturing overhead cost was applied using the direct labor hours from Job A2 and the POHR caiculated in Question 1. (After you joumalize this entry please enter the information into Job \#2 Cost Sheet) Stop 2 Post the joumal entres that you recorded on the "General Joumal" tab to the "T-accounts (General Ledger)" tab and calculate the balance for each account. This is the company's first month of business, so there will not be any beginning balances. 31-Dec Record the entry in the general journal to close the Manufacturing Overhead account and adjust for overapplied/underapplied Prepare a Schedule of Cost of Goods Manufactured and a Schedule of Cost of Goods Sold on the "Schedule of COGM and COGS" tab for Job \#1 and Job H2 that were worked on during the month by the company. Make sure to follow the format noted in your book (pg. 109). (Hint. This is the company's first month of operations and therefore the beginning balances will be zero.) Prepare an Income Statement for the month using the Traditional Format on the "Income Statement tab. Use the following check figures and make any necessary corrections. 14 What is the total prime cost from the Job \#1 Cost Sheet? 15 What is the total conversion cost from the Job \#1 Cost Sheet? 16 What is the total product cost from the Job \#1 Cost Sheet? 17 What was the period cost incurred for the month of December? 18 What is the contribution margin (in dollars) for Job \#1 (assume that all selling and administrative cost and all manufacturing overhead costs are fixed.) 19 If jobH1 was for five tables instead of one, what would be the total amount of variable cost recorded on Job \#1's cost sheet?? 20 If the factory has the capacity to produce five tables each month, what would bo the total actual one