How is the AOC calculated and what are the solutions with steps? An engineer must decide between two ways to pump concrete to the top

How is the AOC calculated and what are the solutions with steps?

image text in transcribed
An engineer must decide between two ways to pump concrete to the top of a seven-story building. Plan 1 requires the leasing of equipment for $60,000 initially and will cost between $0.40 and $0.95 per metric ton to operate, with a most likely cost of $0.50 per metric ton. The pumper can pump 100 metric tons per 8hour day. If leased, the asset will have a contract period of 5 years. Plan 2 is a rental option that will cost $11000 per year. In addition, an extra $18.5 per hour labor cost will be incurred for operating the rented equipment per 8-hour day. Which plan should the engineer recommend ifthe equipment will be needed for 65 days per year? The MARR is 10% per year. "he annual worth of plan 1 lease optimistic is $ 47828 O . "he annual worth of plan 1 most likely is $ 48328 0. "he annual worth of plan 1 pessimistic is $ "he annual worth of plan 2 rental is $ |:| . Plan 1 lease optimistic is better 0 than rental of plan 2. Planl most likely is Othan rental of plan 2 Plan 1 lease pessimistic is 0 than rental of plan 2

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Environmental Economics And Policy

Authors: Thomas H Tietenberg

5th Edition

0321348907, 9780321348906

More Books

Students also viewed these Economics questions