Answered step by step
Verified Expert Solution
Question
1 Approved Answer
HW CH 13 6 Saved 2 Waymouth Manufacturing operates a contract manufacturing plant located in Dublin, Ireland. The plant provides a variety of electronics products
HW CH 13 6 Saved 2 Waymouth Manufacturing operates a contract manufacturing plant located in Dublin, Ireland. The plant provides a variety of electronics products and components to consumer goods manufacturers around the world. Cycle time is a critical success factor for Waymouth, which has developed a number of measures of manufacturing speed. Waymouth has studied the matter and found that competitive contract manufacturers have manufacturing cycle times (MCE) of about 35%, when last calculated, Waymouth's MCE was 32%. 7.5 points Key measures from the recent month's production, averaged over all the jobs during that period, are as follows Average Time (hours) 24.0 0.5 Activity New product development Materials handling Order setup Machine maintenance Order scheduling Inspection of completed order Pack and move to storage or ship Manufacturing assembly Order taking and checking Receiving and stocking raw materials Inspection of raw materials at start of production e Book 1.5 16.0 1.0 0.5 3.0 Print References 1.0 Required Determine the manufacturing cycle efficiency (MCE) for the recent month. (Round your answer to 1 decimal place.) Manufacturing cycle efficiency (MCE) 5%
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started