Question
hw ch2.4 Nova Companys total overhead cost at various levels of activity are presented below: Month Machine- Hours Total Overhead Cost April 46,000 $ 201,180
hw ch2.4
Nova Companys total overhead cost at various levels of activity are presented below:
Month | Machine- Hours | Total Overhead Cost | ||
April | 46,000 | $ | 201,180 | |
May | 36,000 | $ | 175,380 | |
June | 56,000 | $ | 226,980 | |
July | 66,000 | $ | 252,780 | |
|
Assume that the total overhead cost above consists of utilities, supervisory salaries, and maintenance. The breakdown of these costs at the 36,000 machine-hour level of activity is:
Utilities (variable) | $ | 50,400 | ||
Supervisory salaries (fixed) | 67,000 | |||
Maintenance (mixed) | 57,980 | |||
Total overhead cost | $ | 175,380 | ||
|
Nova Companys management wants to break down the maintenance cost into its variable and fixed cost elements.
Required:
1. Estimate how much of the $252,780 of overhead cost in July was maintenance cost. (Hint: To do this, it may be helpful to first determine how much of the $252,780 consisted of utilities and supervisory salaries. Think about the behavior of variable and fixed costs!) (Do not round intermediate calculations.)
Maintenance cost in July=?
2. Using the high-low method, estimate a cost formula for maintenance. (Do not round your intermediate calculations. Round the "Variable cost per machine-hours" to 2 decimal places.)
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access with AI-Powered Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started