I need fast help in this question. I have only 30 minutes. Please do them in excel and do it correctly 100%. QUESTION 1 10

I need fast help in this question. I have only 30 minutes. Please do them in excel and do it correctly 100%.

image text in transcribed

QUESTION 1 10 points Save Answer A series of dikes need to be built along a flood plain. Each dike is practically the same as far as difficulty, terrain, design, etc. The first dike takes 60 days to be built. If subsequent dikes are built at a 55.3105% learning curve rate, state below the time needed to produce the ninth dike (rounded to the closest hundredth of a day, e.g. 24.43 days). For the toolbar, press ALT+F10 (PC) or ALT+FN+F10 (Mac). B 1 U Paragraph Arial 10pt Tv % a === X2 X2 > TT ABC v T 15 X A EXE ;) #

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Take The Trade A Floor Trade

Authors: Tony Wilson

1st Edition

979-8218195458

More Books

Students also viewed these Finance questions