Answered step by step
Verified Expert Solution
Link Copied!

Question

1 Approved Answer

I need help with ALL PARTS of question #3. This is ONE MULTI-PART question. If possible, can you please explain how you got each answer

image text in transcribedimage text in transcribedimage text in transcribedimage text in transcribedimage text in transcribedimage text in transcribedimage text in transcribed

I need help with ALL PARTS of question #3. This is ONE MULTI-PART question.

If possible, can you please explain how you got each answer and why the answer is what it is.

PLEASE HELP ASAP this is due soon!!!

Beauville Furniture Corporation produces sofas, recliners, and lounge chairs. Beauville is located in a medium-sized community in the southeastern part of the United States. It is a major employer in the community. In fact, the economic well-being of the community is tied very strongly to Beauville. Beauville operates a sawmill, a fabric plant, and a furniture plant in the same community. The sawmill buys logs from independent producers. The sawmill then processes the logs into four grades of lumber: firsts and seconds, No. 1 common, No. 2 common, and No. 3 common. All costs incurred in the mill are common to the four grades of lumber. All four grades of lumber are used by the furniture plant. The mill transfers everything it produces to the furniture plant, and the grades are transferred at cost. Trucks are used to move the lumber from the mill to the furniture plant. Although no outside sales exist, the mill could sell to external customers, and the selling prices of the four grades are known. The fabric plant is responsible for producing the fabric that is used by the furniture plant. To produce three totally different fabrics (identified by fabric ID codes FB60, FB70, and FB80, respectively), the plant has three separate production operations -one for each fabric. Thus, production of all three fabrics occurs at the same time in different locations in the plant. Each fabric's production operation has two processes: the weaving and pattern process and the coloring and bolting process. In the weaving and pattern process, yam is used to create yards of fabric with different designs. In the next process, the fabric is dyed, cut into 25-yard sections, and wrapped around cardboard rods to form 25-yard bolts. The bolts are transported by forklift to the furniture plant's Receiving Department. All of the output of the fabric plant is used by the furniture plant (to produce the sofas and chairs). For accounting purposes, the fabric is transferred at cost to the furniture plant. The furniture plant produces orders for customers on a special-order basis. The customers specify the quantity, style, fabric, lumber grade, and pattern. Typically, jobs are large (involving at least 500 units). The plant has two production departments: Cutting and Assembly. In the Cutting Department, the fabric and wooden frame components are sized and cut. Other components are purchased from external suppliers and are removed from stores as needed for assembly. After the fabric and wooden components are finished for the entire job, they are moved to the Assembly Department. The Assembly Department takes the individual components and assembles the sofas (or chairs). Beauville Furniture has been in business for over two decades and has a good reputation. However, during the past five years, Beauville experienced eroding profits and declining sales. Bids were increasingly lost (even aggressive bids) on the more popular models. Yet, the company was winning bids on some of the more-difficult-to-produce items. Lance Hays, the owner and manager, was frustrated. He simply couldn't understand how some of his competitors could sell for such low prices. On a common sofa job involving 500 units, Beauville's bids were running $25 per unit, or $12,500 per job more than the winning bids (on average). Yet, on the more difficult items, Beauville's bids were running about $60 per unit less than the next closest bid. Gisela Berling, vice president of finance, was assigned the task of preparing a cost analysis of the company's product lines. Lance wanted to know if the company's costs were excessive. Perhaps the company was being wasteful, and it was simply costing more to produce furniture than it was costing its competitors. Gisela prepared herself by reading recent literature on cost management and product costing and attending several conferences that explored the same Issues. She then reviewed the costing procedures of the company's mill and two plants and did a preliminary assessment of their soundness. The production costs of the mill were common to all lumber grades and were assigned using the physical units method. Since the output and production costs were fairly uniform throughout the year, the mill used an actual costing system. Although Gisela had no difficulty with actual costing, she decided to explore the effects of using the sales-value-at-split-off method. Thus, cost and production data for the mill were gathered so that an analysis could be conducted. The two plants used normal costing systems. The fabric plant used process costing, and the furniture plant used job-order costing. Both plants used plantwide overhead rates based on direct labor hours. Based on her initial Haller than reviews, she concluded that the costing procedures for the fabric plant were satisfactory. Essentially, there was no evidence of product diversity. A statistical analysis revealed that about 90 percent of the variability in the plant's overhead cost could be explained by direct labor hours. Thus, the use of a plantwide overhead rate based on direct labor hours seemed justified. What did concern her, though, was the material waste that she observed in the plant. Maybe a standard cost system would be useful for increasing the overall cost efficiency of the plant. Consequently, as part of her report to Lance, she decided to include a description of the fabric plant's costing procedures-at least for one of the fabric types. She also decided to develop a standard cost sheet for the chosen fabric. The furniture plant, however, was a more difficult matter. Product diversity was present and could be causing some distortions in product costs. Furthermore, statistical analysis revealed that only about 40 percent of the variability in overhead cast was explained by the direct labor hours. She decided that additional analysis was needed so that a sound product casting method could be recommended. One possibility would be to increase the number of overhead rates. Thus, she decided to include departmental data so that the effect of moving to departmental rates could be assessed. Finally, she also wanted to explore the possibility of converting the sawmill and fabric plant into profit centers and changing the existing transfer pricing policy. With the cooperation of the cost accounting manager for the mill and each plant's controller, she gathered the following data for last year: Sawmill: Joint manufacturing costs: $900,000 Grade Quantity Produced (board feet) 500.000 Price at Split-Off (per 1,000 board foot) Joint manufacturing costs: $900,000 Grade Firsts and seconds No. 1 common No. 2 common No. 3 common Total Grade Fabric FB60 Fabric FB70 Fabric FBB0 Total Budgeted overhead: $1,200,000 (50% fixed) Practical volume (direct labor hours): 120,000 hours Actual overhead: $1,150,000 (50% fixed) Actual hours worked: Beginning inventories Units* Costs: Transferred in Materials Quantity Produced (board feet) Labor Sawmill: 1,500,000 3,000,000 1,875,000 1,125,000 7,500,000 Fabric Plant: Weaving and Pattern 20,000 28,000 26,000 74,000 Departmental data on Fabric FB70 (actual costs and actual outcomes): Weaving and Pattern Coloring and Bolting 12,000 14,000 18,000 44,000 20,000 $0 Price at Split-Off (per 1,000 board foot) $80,000 $18,000 $300 225 140 100 Total 32,000 42,000 44,000 118,000 Coloring and Bolting 400 $100,000 $8,000 $6,600 Beginning inventories Units* Costs: Transferred in Materials Labor Overhead Current production: Units started Units transferred out Costs: Transferred in Materials Labor Overhead Percentage completion: Beginning inventory Ending inventory Weaving and Pattern 20,000 $0 $80,000 $18,000 $22,000 80,000 80,000 $320,000 $208,000 ? 30% 40% Coloring and Bolting 400 $100,000 $8,000 $6,600 $9,000 ? 3,200 ? $82,000 $99,400 ? 40% 50% *Units are measured yards for the Weaving and Pattern Department and in bolts for the Coloring and Bolting Department. Note: With the exception of the cardboard bolt rods, materials are added at the beginning of each process. The cost of the rods is relatively insignificant and is included in overhead. Proposed standard cost sheet for Fabric FB70 (for the Coloring and Bolting Department only): Transferred-in materials (25 yards @ $10) Other materials (100 ounces @ $0.20) Labor (3.1 hours @ $8) Fixed overhead (3.1 hours @ $5) Variable overhead (3.1 hours @ $5) Standard cost per unit $250.00 20.00 24.80 15.50 15.50 $325.80 Departmental data (budgeted): Overhead Machine hours Receiving orders Square feet Direct labor hours Job A500: Job 875: Service Departments General Receiving Power Maintenance Factory $450,000 $600,000 1,000 Direct labor: Furniture Plant: Direct materials: Fabric FB70 Lumber (No. 1 common) Other components 5,000 Cutting Department Assembly Department Machine time: Cutting Department Assembly Department $300,000 4,000 After some discussion with the furniture plant controller, Gisela decided to use machine hours to calculate the overhead rate for the Cutting Department and direct labor hours for the Assembly Department rate (the Cutting Department was more automated than the Assembly Department). As part of her report, she wanted to compare the effects of plantwide rates and departmental rates on the cost of jobs. She wanted to know if overhead costing could be the source of the pricing problems the company was experiencing. To assess the effect of the different overhead assignment procedures, Gisela decided to examine two prospective jobs. One job, Jab A500, could produce 500 sofas, using a frequently requested style and Fabric FB70. Bids on this type of job were being lost more frequently to competitors. The second job, Job 875, would produce 75 specially designed recliners. This job involved a new design and was more difficult for the workers to build. It involved some special cutting requirements and an unfamiliar assembly. Recently, the company seemed to be winning more bids on jobs of this type. To compute the costs of the two jobs, Gisela assembled the following information on the two jobs: 180 bolts @ $350 20,000 board feet @ $0.12 $26,600 400 hours $10 Producing Departments 1,600 hours @ $8.75 Cutting Assembly $375,000 15,000 9,000 10,000 200,000 $525,000 $750,000 350 machine hours 50 machine hours 60,000 13,500 15,000 50,000 Job B75: Required: Grades Direct materials Fabric FB70 Lumber (first and seconds) Other components Direct labor: Totals Cutting Department Assembly Department Machine time: Cutting Department Assembly Department Firsts and seconds No. 1 common No. 2 common No. 3 common 1. Complete the following table by calculating the sawmill's cost per board for each grade using both the physical units method and the sales-value-at-split-off method. Begin by allocating the joint manufacturing costs to each grade, and calculate the cost per board foot for each grade using each method. Round unit cost answers to two decimal places. a. Physical units method of allocation: Total No. 1 common Grades Firsts and seconds $ No. 2 common No. 3 common $180,000.00 Sales-value-at-split-off method: Allocation 225,000.00 135,000.00 $ 360,000.00 $ 900,000.00 Allocation 26 yards @ $350 2,200 board feet @ $0.12 $3,236 270,000 405,000 157,500 67,500 900,000 70 hours@ $10 240 hours $8.75 90 machine hours 15 machine hours Unit Cost 0.12 0.12 0.12 0.12 Unit Cost 0.18 0.14 0.08 0.06 Firsts and seconds No. 1 common Grade No. 2 common No. 3 common b. Given that the sawmill provides lumber at cost to the furniture plant, using the sales-value-at-split-off method increases to produce each board foot regardless of the grade. Thus, the same cost of lumber would be assigned to a c. The physical units method, often used in the lumber Industry, essentially assumes that it costs the same sofa or chair regardless of which grade is used. This approach has some drawbacks. Intuitively, the higher grades should cost more . Certainly, if the company was buying this input from suppliers, there would be for sofas and chairs depending on the grade of lumber purchased, because the higher grades have a higher selling price. a cost difference The relative sales value method assigns a higher cost to grades that have a higher market value. Thus, the cost assigned to sofas and chairs would differ according to the grade of lumber used. d. Review the data analytic concepts and metrics found in Exhibits 2.5 and 2.6, pp. 37, 40. What are the data analytic models being considered for the Sawmill? Physical and relative sales value method Which of the data analytic types is being used in Part a of Requirement 17 Descriptive And for Part b? Diagnostic and Predictive Part c? Diagnostic Sawmill Cost and Production Data Physical Units Method: Cost per Board Foot 0.12 0.12 0.12 0.12 3. Sales-Value-at-Split-Off Method: Cost per Board Foot $ 2. Calculate the plantwide overhead rate for the fabric plant. 10.00 per hour Note: More than one data analytic type may apply. Which of the data analytic models in play would you recommend for assigning the joint manufacturing sawmill costs? Descriptive, Diagnostic and Predictive - Uring the wint Calculate the amount of under- or overapplied overhead for the fabric plant. $30,000 overapplied 0.18 0.14 0.08 0.06 suprana method complate the following information regarding the Waving and Pattern production pre the cast of Jab A500 by $ and increases the cost of Job B75 by $ 3. a. Using the weighted average method, complete the following information regarding the Weaving and Pattern production process: i. Physical flow schedule (measured in yards) ii. Materials Conversion Costs iii. Unit cost iv. Cost of goods transferred out b. To convert the output of the Weaving and Pattern Department to the output of the Coloring and Bolting Department, yards transferred is divided 00000 c. Using the weighted average method, complete the following for the Coloring and Bolting Department: i. Physical flow schedule (measured in bolts) ii. Equivalent units schedule (measured in bolts) iii. Unit cost Transferred-in Materials Materials Conversion Costs X by Beauville Furniture Corporation produces sofas, recliners, and lounge chairs. Beauville is located in a medium-sized community in the southeastern part of the United States. It is a major employer in the community. In fact, the economic well-being of the community is tied very strongly to Beauville. Beauville operates a sawmill, a fabric plant, and a furniture plant in the same community. The sawmill buys logs from independent producers. The sawmill then processes the logs into four grades of lumber: firsts and seconds, No. 1 common, No. 2 common, and No. 3 common. All costs incurred in the mill are common to the four grades of lumber. All four grades of lumber are used by the furniture plant. The mill transfers everything it produces to the furniture plant, and the grades are transferred at cost. Trucks are used to move the lumber from the mill to the furniture plant. Although no outside sales exist, the mill could sell to external customers, and the selling prices of the four grades are known. The fabric plant is responsible for producing the fabric that is used by the furniture plant. To produce three totally different fabrics (identified by fabric ID codes FB60, FB70, and FB80, respectively), the plant has three separate production operations -one for each fabric. Thus, production of all three fabrics occurs at the same time in different locations in the plant. Each fabric's production operation has two processes: the weaving and pattern process and the coloring and bolting process. In the weaving and pattern process, yam is used to create yards of fabric with different designs. In the next process, the fabric is dyed, cut into 25-yard sections, and wrapped around cardboard rods to form 25-yard bolts. The bolts are transported by forklift to the furniture plant's Receiving Department. All of the output of the fabric plant is used by the furniture plant (to produce the sofas and chairs). For accounting purposes, the fabric is transferred at cost to the furniture plant. The furniture plant produces orders for customers on a special-order basis. The customers specify the quantity, style, fabric, lumber grade, and pattern. Typically, jobs are large (involving at least 500 units). The plant has two production departments: Cutting and Assembly. In the Cutting Department, the fabric and wooden frame components are sized and cut. Other components are purchased from external suppliers and are removed from stores as needed for assembly. After the fabric and wooden components are finished for the entire job, they are moved to the Assembly Department. The Assembly Department takes the individual components and assembles the sofas (or chairs). Beauville Furniture has been in business for over two decades and has a good reputation. However, during the past five years, Beauville experienced eroding profits and declining sales. Bids were increasingly lost (even aggressive bids) on the more popular models. Yet, the company was winning bids on some of the more-difficult-to-produce items. Lance Hays, the owner and manager, was frustrated. He simply couldn't understand how some of his competitors could sell for such low prices. On a common sofa job involving 500 units, Beauville's bids were running $25 per unit, or $12,500 per job more than the winning bids (on average). Yet, on the more difficult items, Beauville's bids were running about $60 per unit less than the next closest bid. Gisela Berling, vice president of finance, was assigned the task of preparing a cost analysis of the company's product lines. Lance wanted to know if the company's costs were excessive. Perhaps the company was being wasteful, and it was simply costing more to produce furniture than it was costing its competitors. Gisela prepared herself by reading recent literature on cost management and product costing and attending several conferences that explored the same Issues. She then reviewed the costing procedures of the company's mill and two plants and did a preliminary assessment of their soundness. The production costs of the mill were common to all lumber grades and were assigned using the physical units method. Since the output and production costs were fairly uniform throughout the year, the mill used an actual costing system. Although Gisela had no difficulty with actual costing, she decided to explore the effects of using the sales-value-at-split-off method. Thus, cost and production data for the mill were gathered so that an analysis could be conducted. The two plants used normal costing systems. The fabric plant used process costing, and the furniture plant used job-order costing. Both plants used plantwide overhead rates based on direct labor hours. Based on her initial Haller than reviews, she concluded that the costing procedures for the fabric plant were satisfactory. Essentially, there was no evidence of product diversity. A statistical analysis revealed that about 90 percent of the variability in the plant's overhead cost could be explained by direct labor hours. Thus, the use of a plantwide overhead rate based on direct labor hours seemed justified. What did concern her, though, was the material waste that she observed in the plant. Maybe a standard cost system would be useful for increasing the overall cost efficiency of the plant. Consequently, as part of her report to Lance, she decided to include a description of the fabric plant's costing procedures-at least for one of the fabric types. She also decided to develop a standard cost sheet for the chosen fabric. The furniture plant, however, was a more difficult matter. Product diversity was present and could be causing some distortions in product costs. Furthermore, statistical analysis revealed that only about 40 percent of the variability in overhead cast was explained by the direct labor hours. She decided that additional analysis was needed so that a sound product casting method could be recommended. One possibility would be to increase the number of overhead rates. Thus, she decided to include departmental data so that the effect of moving to departmental rates could be assessed. Finally, she also wanted to explore the possibility of converting the sawmill and fabric plant into profit centers and changing the existing transfer pricing policy. With the cooperation of the cost accounting manager for the mill and each plant's controller, she gathered the following data for last year: Sawmill: Joint manufacturing costs: $900,000 Grade Quantity Produced (board feet) 500.000 Price at Split-Off (per 1,000 board foot) Joint manufacturing costs: $900,000 Grade Firsts and seconds No. 1 common No. 2 common No. 3 common Total Grade Fabric FB60 Fabric FB70 Fabric FBB0 Total Budgeted overhead: $1,200,000 (50% fixed) Practical volume (direct labor hours): 120,000 hours Actual overhead: $1,150,000 (50% fixed) Actual hours worked: Beginning inventories Units* Costs: Transferred in Materials Quantity Produced (board feet) Labor Sawmill: 1,500,000 3,000,000 1,875,000 1,125,000 7,500,000 Fabric Plant: Weaving and Pattern 20,000 28,000 26,000 74,000 Departmental data on Fabric FB70 (actual costs and actual outcomes): Weaving and Pattern Coloring and Bolting 12,000 14,000 18,000 44,000 20,000 $0 Price at Split-Off (per 1,000 board foot) $80,000 $18,000 $300 225 140 100 Total 32,000 42,000 44,000 118,000 Coloring and Bolting 400 $100,000 $8,000 $6,600 Beginning inventories Units* Costs: Transferred in Materials Labor Overhead Current production: Units started Units transferred out Costs: Transferred in Materials Labor Overhead Percentage completion: Beginning inventory Ending inventory Weaving and Pattern 20,000 $0 $80,000 $18,000 $22,000 80,000 80,000 $320,000 $208,000 ? 30% 40% Coloring and Bolting 400 $100,000 $8,000 $6,600 $9,000 ? 3,200 ? $82,000 $99,400 ? 40% 50% *Units are measured yards for the Weaving and Pattern Department and in bolts for the Coloring and Bolting Department. Note: With the exception of the cardboard bolt rods, materials are added at the beginning of each process. The cost of the rods is relatively insignificant and is included in overhead. Proposed standard cost sheet for Fabric FB70 (for the Coloring and Bolting Department only): Transferred-in materials (25 yards @ $10) Other materials (100 ounces @ $0.20) Labor (3.1 hours @ $8) Fixed overhead (3.1 hours @ $5) Variable overhead (3.1 hours @ $5) Standard cost per unit $250.00 20.00 24.80 15.50 15.50 $325.80 Departmental data (budgeted): Overhead Machine hours Receiving orders Square feet Direct labor hours Job A500: Job 875: Service Departments General Receiving Power Maintenance Factory $450,000 $600,000 1,000 Direct labor: Furniture Plant: Direct materials: Fabric FB70 Lumber (No. 1 common) Other components 5,000 Cutting Department Assembly Department Machine time: Cutting Department Assembly Department $300,000 4,000 After some discussion with the furniture plant controller, Gisela decided to use machine hours to calculate the overhead rate for the Cutting Department and direct labor hours for the Assembly Department rate (the Cutting Department was more automated than the Assembly Department). As part of her report, she wanted to compare the effects of plantwide rates and departmental rates on the cost of jobs. She wanted to know if overhead costing could be the source of the pricing problems the company was experiencing. To assess the effect of the different overhead assignment procedures, Gisela decided to examine two prospective jobs. One job, Jab A500, could produce 500 sofas, using a frequently requested style and Fabric FB70. Bids on this type of job were being lost more frequently to competitors. The second job, Job 875, would produce 75 specially designed recliners. This job involved a new design and was more difficult for the workers to build. It involved some special cutting requirements and an unfamiliar assembly. Recently, the company seemed to be winning more bids on jobs of this type. To compute the costs of the two jobs, Gisela assembled the following information on the two jobs: 180 bolts @ $350 20,000 board feet @ $0.12 $26,600 400 hours $10 Producing Departments 1,600 hours @ $8.75 Cutting Assembly $375,000 15,000 9,000 10,000 200,000 $525,000 $750,000 350 machine hours 50 machine hours 60,000 13,500 15,000 50,000 Job B75: Required: Grades Direct materials Fabric FB70 Lumber (first and seconds) Other components Direct labor: Totals Cutting Department Assembly Department Machine time: Cutting Department Assembly Department Firsts and seconds No. 1 common No. 2 common No. 3 common 1. Complete the following table by calculating the sawmill's cost per board for each grade using both the physical units method and the sales-value-at-split-off method. Begin by allocating the joint manufacturing costs to each grade, and calculate the cost per board foot for each grade using each method. Round unit cost answers to two decimal places. a. Physical units method of allocation: Total No. 1 common Grades Firsts and seconds $ No. 2 common No. 3 common $180,000.00 Sales-value-at-split-off method: Allocation 225,000.00 135,000.00 $ 360,000.00 $ 900,000.00 Allocation 26 yards @ $350 2,200 board feet @ $0.12 $3,236 270,000 405,000 157,500 67,500 900,000 70 hours@ $10 240 hours $8.75 90 machine hours 15 machine hours Unit Cost 0.12 0.12 0.12 0.12 Unit Cost 0.18 0.14 0.08 0.06 Firsts and seconds No. 1 common Grade No. 2 common No. 3 common b. Given that the sawmill provides lumber at cost to the furniture plant, using the sales-value-at-split-off method increases to produce each board foot regardless of the grade. Thus, the same cost of lumber would be assigned to a c. The physical units method, often used in the lumber Industry, essentially assumes that it costs the same sofa or chair regardless of which grade is used. This approach has some drawbacks. Intuitively, the higher grades should cost more . Certainly, if the company was buying this input from suppliers, there would be for sofas and chairs depending on the grade of lumber purchased, because the higher grades have a higher selling price. a cost difference The relative sales value method assigns a higher cost to grades that have a higher market value. Thus, the cost assigned to sofas and chairs would differ according to the grade of lumber used. d. Review the data analytic concepts and metrics found in Exhibits 2.5 and 2.6, pp. 37, 40. What are the data analytic models being considered for the Sawmill? Physical and relative sales value method Which of the data analytic types is being used in Part a of Requirement 17 Descriptive And for Part b? Diagnostic and Predictive Part c? Diagnostic Sawmill Cost and Production Data Physical Units Method: Cost per Board Foot 0.12 0.12 0.12 0.12 3. Sales-Value-at-Split-Off Method: Cost per Board Foot $ 2. Calculate the plantwide overhead rate for the fabric plant. 10.00 per hour Note: More than one data analytic type may apply. Which of the data analytic models in play would you recommend for assigning the joint manufacturing sawmill costs? Descriptive, Diagnostic and Predictive - Uring the wint Calculate the amount of under- or overapplied overhead for the fabric plant. $30,000 overapplied 0.18 0.14 0.08 0.06 suprana method complate the following information regarding the Waving and Pattern production pre the cast of Jab A500 by $ and increases the cost of Job B75 by $ 3. a. Using the weighted average method, complete the following information regarding the Weaving and Pattern production process: i. Physical flow schedule (measured in yards) ii. Materials Conversion Costs iii. Unit cost iv. Cost of goods transferred out b. To convert the output of the Weaving and Pattern Department to the output of the Coloring and Bolting Department, yards transferred is divided 00000 c. Using the weighted average method, complete the following for the Coloring and Bolting Department: i. Physical flow schedule (measured in bolts) ii. Equivalent units schedule (measured in bolts) iii. Unit cost Transferred-in Materials Materials Conversion Costs X by

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access to Expert-Tailored Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image_2

Step: 3

blur-text-image_3

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Financial Accounting And Reporting A Global Perspective

Authors: Herve Stolowy, Yuan Ding, Luc Paugam

6th Edition

147376730X, 9781473767300

More Books

Students also viewed these Accounting questions