i need Risks, project manager authority and closing (just brief explanation to close our presentation) project description:- The total cost of the office renovation shall
i need Risks, project manager authority and closing (just brief explanation to close our presentation)
project description:-
The total cost of the office renovation shall not exceed $75,000.00. All renovations and cleanup must be finished by April 10, 2023. The goal of this project is to modify the workplace to meet the needs of the workforce both now and in the future. |
The RBC Office of size 1000 sq ft. is being renovated as part of this project. The renovation will result in a significant long-term investment in the facility to fulfil the demands of staff both now and in the future. Aside from ensuring that the existing office space complies with current building codes, accessibility standards, and sustainability practices.Green energy and sustainable building practices are significant drivers for modern building requirements. This project will have a goal of incorporating green initiatives. Use of wood framing and heavy timber framing be incorporated into the design as much as possible. Using a timber design expressing the natural wood framing would add to the indoor environmental appeal. Incorporating windows that provide natural daylight into the building interior should be considered where possible. HVAC systems that are energy efficient will feature energy recovery ventilation, air-source heat pumps, and maybe geothermal energy. The expansions and fully renovated space will comply with the AODA. |
Step by Step Solution
There are 3 Steps involved in it
Step: 1
Get Instant Access to Expert-Tailored Solutions
See step-by-step solutions with expert insights and AI powered tools for academic success
Step: 2
Step: 3
Ace Your Homework with AI
Get the answers you need in no time with our AI-driven, step-by-step assistance
Get Started