Answered step by step
Verified Expert Solution
Link Copied!

Question

...
1 Approved Answer

I need this in 4 hours and I will pay 50.00 Please make original, no copy and pasting because this does go through turnitin and

image text in transcribed

I need this in 4 hours and I will pay 50.00

Please make original, no copy and pasting because this does go through turnitin and we all know it is world wide.

image text in transcribed Space Age Furniture Company Read \"Space Age Furniture Company\" in Chapter 9 of your text. Respond to the following and include any Materials Requirement Planning (MRP) calculations: Develop an MRP for Space Age Furniture Company using the information in the case including the production of sub-assemblies in lot sizes of 1,000. The lot size of 1,000 for sub-assemblies has produced a lumpy demand for part 3079. Suggest ways for improvements over sub-assemblies in lot sizes of 1,000. Analyze the trade-off between overtime costs and inventory costs. Calculate a new MRP that improves the base MRP. Compare and contrast the types of production processingjob shop, batch, repetitive, or continuousand determine which the primary mode of operation is and why. Describe ways that management can keep track of job status and location during production. Recommend any changes that might be beneficial to the company and/or add value for the customer. The final case study should demonstrate your understanding of the reading as well as the implications of new knowledge. The paper should integrate readings, scholarly sources, and class discussions into work and life experiences. It may include explanation and examples from previous events as well as implications for future applications. The purpose of the final case study is for you to culminate the learning achieved in the course by describing your understanding and application of knowledge in the field of operations management. Writing the Final Paper The Final Paper: Must be 10 to 12 double-spaced pages in length (not including the title and reference pages) and formatted according to APA style as outlined in the Ashford Writing Center. Must include a title page with the following: o Title of paper o Student's name o Course name and number o Instructor's name o Date submitted Must begin with an introductory paragraph that has a succinct thesis statement. Must address the topic of the paper with critical thought. Must end with a conclusion that reaffirms your thesis. Must use at least five scholarly sources. Must document all sources in APA style, as outlined in the Ashford Writing Center. Must include a separate reference page, formatted according to APA style as outlined in the Ashford Writing Center. Space Age Furniture Company The Space Age Furniture Company manufactures tables and cabinets to hold microwave ovens a nd portable televisions. These products aremade in various sizes and with various features, but al l follow basically the same production and assembly operations. However, two of theseproducts the Saturn microwave stand and the Gemini TV standhave a part (no. 3079) that requires m achining on a special lathe used onlyfor making that part. At present the machine is run by Ed Sz ewczak, a machinist who also operates other machines in Space Age's shop. Onceset up and star ted, the lathe can run nearly unattended. However, the machinist must be present (even if not a ctually attending the machine)any time one of the machines, including the lathe, is in operation. At present, Ed works a regular 40-hour week. However, due to the workloadfor producing part 3 079, it has been necessary to schedule frequent overtime for him in order to finish the necessar y parts on time. Coral Snodgrass, operations manager for Space Age, has just heard from Ed's foremen that Ed is becoming unhappy about so much overtime. AsCoral knows, Ed has been with the company a lo ng time and is an excellent, reliable employee. Skilled machinists with Ed's experience andemplo yment record are extremely difficult to find. Coral wonders what can be done to alleviate this pr oblem. Recently, Space Age began using an MRP system that has helped reduce inventories greatly and improve on-time deliveries. In fact, Space Agecarries no finished-goods inventory. Instead, every thing in the master schedule is being produced for customer orders, so all products areshipped almost immediately. Previously Space Age had estimated that it cost $1.25 per week to store ea ch Gemini and $1.50 per week to storeeach Saturn that wasn't shipped immediately. The master schedule for producing these two items for the next six weeks is shown below. Master Schedule Week 1 2 3 4 5 6 Gemini 600 400 700 500 400 600 Saturn 300 400 400 600 300 300 The part in question, 3079, is used in two different subassemblies: no. 435, which is used in the Gemini TV stand, and no. 257, which is used inthe Saturn microwave stand. One of part 3079 is used in each subassembly, and one of each subassembly is used in each of the final products. Part 3079 may be produced in any quantity since the lathe that makes it is not used for anything else. However, both of the subassemblies areproduced using the same equipment. To minimize change over time, Space Age has decided that these subassemblies should be made inminimum quantities of 1,000 at a time, although there is no problem with capacity on the equipment that makes them. In fact, an order for1,000 of subassembly 435 is due to be received in week 1, as is an order for 1,000 of subassembly 257. Lead time for both these subassembliesis one week, and no inventory is expected to be on hand for either part at the beginning of week 1. There is not a ny on-hand inventory of part3079, and there are no orders in process. Ed Szewczak earns $22 per hour and gets a 50% premium for any overtime work. Whenever par t 3079 is made, there is no set-up time, butprocessing takes 0.03 hour per unit. It costs $0.25 pe r week to hold any of these parts over from one week to the next. The cost of holdingeach suba ssembly in inventory is $0.75 per unit per week

Step by Step Solution

There are 3 Steps involved in it

Step: 1

blur-text-image

Get Instant Access with AI-Powered Solutions

See step-by-step solutions with expert insights and AI powered tools for academic success

Step: 2

blur-text-image

Step: 3

blur-text-image

Ace Your Homework with AI

Get the answers you need in no time with our AI-driven, step-by-step assistance

Get Started

Recommended Textbook for

Data Structures and Algorithm Analysis in Java

Authors: Mark A. Weiss

3rd edition

978-0132576277

Students also viewed these Finance questions